Spain: solar plant site data

Solar power plant in Huelva, Spain: yield, tilt angle and row spacing

Huelva: 1,700 kWh per kWp a year at the optimal tilt of 34°, 1° west of south (PVGIS). 5.2% above the median of the main cities of Spain (1,615). #20 of 147 main cities of Spain by yield. For comparison, Kyiv: 1,114 kWh/kWp — 52.6% more here.

Huelva is in the province of Huelva, Andalusia. Population 144,258 (GeoNames). 34 m above sea level. 86 km away: Seville, the nearest bigger city, 1,672 kWh/kWp — 1.7% more here. 5.45 m between rows, pitch 9.42 m, GCR 0.51 (latitude 37.3°).

Yield of 1 kWp
1,700kWh/year
Tilt
34°1° west of south
10 kW
16,996kWh/year
Row pitch
9.42m · GCR 0.51
Rank in the country
20of 147 cities

Ground frame designer

A ground frame for a solar plant: Huelva

Latitude 37.3°: the tilt and the row pitch follow it. Enter the snow and wind for Spain in the designer, by the national annex to the Eurocode.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

118Jan120Feb144Mar149Apr163May160Jun170Jul167Aug151Sep134Oct114Nov111Dec

July: 170 kWh/kWp, December: 111 — 1.5 times less.

November: 114 against the median of 103 for the main cities of Spain, 10.7% more.

Huelva: plants, kWh
kWpA yearJulyDecember
58,498850555
1016,9961,7001,110
1525,4942,5501,665

Fixed tilt facing south

What a table yields at another tilt than the optimal 34° — for roofs and frames with a standard slope.

Huelva: yield at a fixed tilt, kWh/kWp
TiltA yearAgainst the optimum
34° (optimum)1,700—
15°1,623−4.5%
30°1,696−0.2%
45°1,676−1.4%
90°1,075−36.8%

Snow and wind loads

Snow and wind loads for a site in Spain follow CTE DB SE-AE (Spain’s Código Técnico de la Edificación) and, where the Eurocodes are applied, UNE-EN 1991-1-3 and UNE-EN 1991-1-4 with the Spanish National Annex. Solispec computes loads by the Ukrainian DBN V.1.2-2 only, so this page shows no snow or wind values for Spain: enter the characteristic values from these documents in the designer’s «Own snow S0» and «Own wind W0» fields.

The frame calculation for such a site is preliminary: before installation it must be checked by an engineer who works to the country’s standards.

Nearby cities

Spain: all cities and regions

Sources

Preliminary calculation: a design needs an engineer’s check.