Spain: solar plant site data

Solar power plant in Almería, Spain: yield, tilt angle and row spacing

Almería: 1,723 kWh per kWp a year at the optimal tilt of 35°, 3° west of south (PVGIS). 6.6% above the median of the main cities of Spain (1,615). #14 of 147 main cities of Spain by yield. For comparison, Kyiv: 1,114 kWh/kWp — 54.6% more here.

Almería is in the province of Almería, Andalusia. Population 196,851 (GeoNames). 21 m above sea level. 109 km away: Granada, the nearest bigger city, 1,673 kWh/kWp — 3.0% more here. 5.49 m between rows, pitch 9.41 m, GCR 0.51 (latitude 36.8°).

Yield of 1 kWp
1,723kWh/year
Tilt
35°3° west of south
10 kW
17,228kWh/year
Row pitch
9.41m · GCR 0.51
Rank in the country
14of 147 cities

Ground frame designer

A ground frame for a solar plant: Almería

Latitude 36.8°: the tilt and the row pitch follow it. Enter the snow and wind for Spain in the designer, by the national annex to the Eurocode.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

121Jan125Feb149Mar154Apr163May161Jun167Jul165Aug148Sep136Oct116Nov119Dec

July: 167 kWh/kWp, November: 116 — 1.4 times less.

December: 119 against the median of 103 for the main cities of Spain, 15.5% more.

Almería: plants, kWh
kWpA yearJulyNovember
58,614835580
1017,2281,6701,160
1525,8422,5051,740

Fixed tilt facing south

What a table yields at another tilt than the optimal 35° — for roofs and frames with a standard slope.

Almería: yield at a fixed tilt, kWh/kWp
TiltA yearAgainst the optimum
35° (optimum)1,723—
15°1,641−4.7%
30°1,717−0.4%
45°1,701−1.3%
90°1,088−36.9%

Snow and wind loads

Snow and wind loads for a site in Spain follow CTE DB SE-AE (Spain’s Código Técnico de la Edificación) and, where the Eurocodes are applied, UNE-EN 1991-1-3 and UNE-EN 1991-1-4 with the Spanish National Annex. Solispec computes loads by the Ukrainian DBN V.1.2-2 only, so this page shows no snow or wind values for Spain: enter the characteristic values from these documents in the designer’s «Own snow S0» and «Own wind W0» fields.

The frame calculation for such a site is preliminary: before installation it must be checked by an engineer who works to the country’s standards.