Spain: solar plant site data

Solar power plant in Lorca, Spain: yield, tilt angle and row spacing

Lorca: 1,682 kWh per kWp a year at the optimal tilt of 35°, 2° east of south (PVGIS). 4.1% above the median of the main cities of Spain (1,615). #25 of 147 main cities of Spain by yield. For comparison, Kyiv: 1,114 kWh/kWp — 51.0% more here.

Lorca is in Region of Murcia. Population 93,079 (GeoNames). 339 m above sea level. 61 km away: Murcia, the nearest bigger city, 1,630 kWh/kWp — 3.2% more here. 5.70 m between rows, pitch 9.62 m, GCR 0.50 (latitude 37.7°).

Yield of 1 kWp
1,682kWh/year
Tilt
35°2° east of south
10 kW
16,818kWh/year
Row pitch
9.62m · GCR 0.50
Rank in the country
25of 147 cities

Ground frame designer

A ground frame for a solar plant: Lorca

Latitude 37.7°: the tilt and the row pitch follow it. Enter the snow and wind for Spain in the designer, by the national annex to the Eurocode.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

123Jan120Feb144Mar145Apr157May157Jun164Jul161Aug142Sep135Oct117Nov116Dec

July: 164 kWh/kWp, December: 116 — 1.4 times less.

November: 117 against the median of 103 for the main cities of Spain, 13.6% more.

Lorca: plants, kWh
kWpA yearJulyDecember
58,409820580
1016,8181,6401,160
1525,2272,4601,740

Snow and wind loads

Snow and wind loads for a site in Spain follow CTE DB SE-AE (Spain’s Código Técnico de la Edificación) and, where the Eurocodes are applied, UNE-EN 1991-1-3 and UNE-EN 1991-1-4 with the Spanish National Annex. Solispec computes loads by the Ukrainian DBN V.1.2-2 only, so this page shows no snow or wind values for Spain: enter the characteristic values from these documents in the designer’s «Own snow S0» and «Own wind W0» fields.

The frame calculation for such a site is preliminary: before installation it must be checked by an engineer who works to the country’s standards.

Nearby cities

Spain: all cities and regions

Sources

Preliminary calculation: a design needs an engineer’s check.