Solar power plant in Norderstedt, Germany: yield, tilt angle and row spacing
Norderstedt: 976 kWh per kWp a year at the optimal tilt of 39°, 2° east of south (PVGIS). 6.6% below the median of the main cities of Germany (1,045). #191 of 193 main cities of Germany by yield. For comparison, Kyiv: 1,114 kWh/kWp — 12.4% less here.
Norderstedt is in Schleswig-Holstein. Population 82,844 (GeoNames). 34 m above sea level. 17 km away: Hamburg, the nearest bigger city, 990 kWh/kWp — 1.4% less here. 17.61 m between rows, pitch 21.33 m, GCR 0.22 (latitude 53.7°).
- Yield of 1 kWp
- 976kWh/year
- Tilt
- 39°2° east of south
- 10 kW
- 9,756kWh/year
- Row pitch
- 21.33m · GCR 0.22
- Rank in the country
- 191of 193 cities
Ground frame designer
A ground frame for a solar plant: Norderstedt
Latitude 53.7°: the tilt and the row pitch follow it. Enter the snow and wind for Germany in the designer, by the national annex to the Eurocode.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
May: 126 kWh/kWp, December: 22 — 5.7 times less.
December: 22 against the median of 30 for the main cities of Germany, 26.7% less.
| kWp | A year | May | December |
|---|---|---|---|
| 5 | 4,878 | 630 | 110 |
| 10 | 9,756 | 1,260 | 220 |
| 15 | 14,634 | 1,890 | 330 |
Snow and wind loads
Snow and wind loads for a site in Germany follow DIN EN 1991-1-3/NA (snow load zone, Schneelastzone) and DIN EN 1991-1-4/NA (wind zone, Windzone). Solispec computes loads by the Ukrainian DBN V.1.2-2 only, so this page shows no snow or wind values for Germany: enter the characteristic values from these documents in the designer’s «Own snow S0» and «Own wind W0» fields.
The frame calculation for such a site is preliminary: before installation it must be checked by an engineer who works to the country’s standards.
Nearby cities
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation, population and divisions (changed)
- Where to take snow and wind loads from: DIN EN 1991-1-3/NA, DIN EN 1991-1-4/NA
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.