Solar power plant in Lahr, Germany: yield, tilt angle and row spacing

Lahr: 1,133 kWh per kWp a year at the optimal tilt of 38°, 1° east of south (PVGIS). 8.5% above the median of the main cities of Germany (1,045). #10 of 193 main cities of Germany by yield. For comparison, Kyiv: 1,114 kWh/kWp — 1.7% more here.

Lahr is in Baden-Württemberg. Population 50,775 (GeoNames). 176 m above sea level. 16 km away: Offenburg, the nearest bigger city, the same 1,137 kWh/kWp. 10.95 m between rows, pitch 14.72 m, GCR 0.33 (latitude 48.3°).

Yield of 1 kWp
1,133kWh/year
Tilt
38°1° east of south
10 kW
11,332kWh/year
Row pitch
14.72m · GCR 0.33
Rank in the country
10of 193 cities

Ground frame designer

A ground frame for a solar plant: Lahr

Latitude 48.3°: the tilt and the row pitch follow it. Enter the snow and wind for Germany in the designer, by the national annex to the Eurocode.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

48Jan66Feb101Mar119Apr124May130Jun133Jul124Aug113Sep85Oct51Nov42Dec

July: 133 kWh/kWp, December: 42 — 3.2 times less.

December: 42 against the median of 30 for the main cities of Germany, 40.0% more.

Lahr: plants, kWh
kWpA yearJulyDecember
55,666665210
1011,3321,330420
1516,9981,995630

Snow and wind loads

Snow and wind loads for a site in Germany follow DIN EN 1991-1-3/NA (snow load zone, Schneelastzone) and DIN EN 1991-1-4/NA (wind zone, Windzone). Solispec computes loads by the Ukrainian DBN V.1.2-2 only, so this page shows no snow or wind values for Germany: enter the characteristic values from these documents in the designer’s «Own snow S0» and «Own wind W0» fields.

The frame calculation for such a site is preliminary: before installation it must be checked by an engineer who works to the country’s standards.

Nearby cities

Germany: all cities and regions

Sources

Preliminary calculation: a design needs an engineer’s check.