Definition

A string is a group of panels connected in series, plus to minus. The panel voltages add up, while the current through the string is the same. Several strings can be paralleled on one inverter input, and then their currents add up.

Two conditions bound a string’s length. From above, frost: the string’s UOC MAX at the site minimum temperature must not exceed the inverter’s maximum input voltage. From below, heat: the operating voltage of a hot string must not drop below the lower end of the MPPT window, or the inverter loses power or fails to start.

Example for Kyiv (Tmin = −40 °C): an illustrative panel with Uoc 49.5 V and α −0.25 %/K gives 57.5 V in frost. An inverter with an 800 V limit takes at most ⌊800 / 57.5⌋ = 13 panels per string. At −25 °C the same arithmetic would allow 14 panels, which is 805 V in a real Kyiv frost.

The string current matters too: ISC MAX = 1.25·ISC STC sets the DC cable section, and with three or more parallel strings on one input it decides whether fuses are needed. Panels in one string should be identical and face the same way: the weakest or shaded panel drags the whole chain down.

A few layout tips. Start from the top limit: divide the inverter's Vmax by the panel's UOC MAX in frost and round down. Then check the lower end of the MPPT window in heat. If there is room between the limits, a longer string has higher voltage and lower current, and so lower losses in the cable. Equal panel counts on every string of one tracker are a must, and different orientations (east and west) are a reason to put strings on different inputs. On a ground frame it helps when one table row is one or two strings: the cable runs are then shorter and alike.

How Solispec applies it

The Solispec engine assigns panels to MPPT inputs automatically: for each input it computes the allowed panel count at the site Tmin and checks voltage, input current, fuses and cable per DSTU HD 60364-7-712:2022. You can change the layout by hand in the constructor and the check reruns. In the free string calculator you only pick a panel, an inverter and a temperature.

String calculator

Norms and clauses

Related terms

The whole glossary

Solispec’s calculation is preliminary: for a design it has to be checked by an engineer. The values and clauses follow the current editions of the norms on the date of the page.