Section of the table from the Solispec engine (median zone — Cherkasy)

Yingli

Ground frame for 60 Yingli PANDA 3.0 Pro YL590CF72e/2 panels (3×20)

3 rows of 20 panels, 35.40 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
35.40kW
Steel
1,511.6kg
Posts
34
Bolts
514
Materials
180,476₴
Yield
40,313kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the Yingli PANDA 3.0 Pro YL590CF72e/2 panel and the 3 × 20 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersC-channel 100×50×2.5C-channel 100×50×2.5Tube 60×60×2
Purlins and bracesC-channel 60×40×2C-channel 41×41×2.5C-channel 60×40×2
Frames11 frames, pitch up to 2,250 mm17 frames, pitch up to 1,420 mm13 frames, pitch up to 1,890 mm
Posts223439
Footings (bored concrete)22 pcs, Ø500 mm, depth 1,500 mm34 pcs, Ø350 mm, depth 1,300 mm39 pcs, Ø400 mm, depth 1,500 mm
Concrete7.13 m³4.68 m³8.09 m³
Tilt30°30°30°
Panel bottom / post top600 / 3,101 mm600 / 3,118 mm600 / 3,315 mm
Panel field size23,200 × 4,552 mm23,200 × 4,542 mm23,200 × 4,883 mm
Row spacing between tables (no shade on 21 December)15,420 mm at noon · 17,340 mm ±2 h17,090 mm at noon · 19,740 mm ±2 h18,730 mm at noon · 22,260 mm ±2 h
Steel1,135.1 kg1,511.6 kg1,374.8 kg
BoltsM10 — 280, M8 — 126M10 — 388, M8 — 126M10 — 342, M8 — 126
Panel clampsend 12, middle 114end 12, middle 114end 12, middle 114
Materials160,271 UAH180,476 UAH175,524 UAH
With installation and delivery249,538 UAH269,148 UAH265,354 UAH
Per 1 kW7,049 UAH/kW7,603 UAH/kW7,496 UAH/kW
Yield1,266 kWh/kW · 44,832 kWh/year1,139 kWh/kW · 40,313 kWh/year1,043 kWh/kW · 36,927 kWh/year
Strength σ/fy84%80%85%
Deflection / (L/200)74%56%63%
Rafter strength91%77%99%
Post utilisation47%40%62%
Utilisation98%97%93%
Depth vs frost depthokokok
Bolt utilisation25%22%24%
Plate section5%4%11%
Not includedengineer to checkengineer to checkengineer to check
Post utilisation П3——19%
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Kherson: Frame spacing 2 250 mm, 11 frames. Purlin C-channel 60×40×2: strength 84%, deflection 74% of L/200 (snow on panel 489 Pa).Cherkasy: Frame spacing 1 420 mm, 17 frames. Purlin C-channel 41×41×2.5: strength 80%, deflection 56% of L/200 (snow on panel 977 Pa).Chernihiv: Frame spacing 1 890 mm, 13 frames. Purlin C-channel 60×40×2: strength 85%, deflection 63% of L/200 (snow on panel 1 106 Pa).
  • Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Kherson: Rafter C-channel 100×50×2.5: span between posts 3 511, cantilever 1 271 mm → strength 91%.Chernihiv: Rafter · Tube 60×60×2 · 3 posts, spans between posts 2 149 mm, cantilever 878 mm — continuous beam on 3 supports → strength 99%.
  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø500 × 1 500: 0.295 m³ of concrete per post. Wind uplift on the front post ≈ 23.6 kN (with γ=1.5) vs ≈ 24.0 kN (concrete weight + soil friction, estimate) → 98%.Cherkasy: Foundation Ø350 × 1 300: 0.125 m³ of concrete per post. Wind uplift on the front post ≈ 13.0 kN (with γ=1.5) vs ≈ 13.4 kN (concrete weight + soil friction, estimate) → 97%.Chernihiv: Foundation Ø400 × 1 500: 0.188 m³ of concrete per post. Wind uplift on the front post ≈ 16.9 kN (with γ=1.5) vs ≈ 18.2 kN (concrete weight + soil friction, estimate) → 93%.
  • Stock length, mmKherson: Rafter 6 054 mm is longer than the 6 000 mm stock length — 2 pieces: Кр1а 5 760, Кр1б 294 mm. Splice — plate Н1 L 300 mm of the same profile, back to back, 2+2 bolts M10 cl. 8.8, at 5 760 mm from the lower end of the rafter, where the moment is small. Bolt: 4.45 kN vs 18.00 kN (25%), plate 5%. Rafter splice — engineer to check: the plate's eccentricity, the C-channel's torsion and the axial force are not included.Cherkasy: Rafter 6 054 mm is longer than the 6 000 mm stock length — 2 pieces: Кр1а 300, Кр1б 5 754 mm. Splice — plate Н1 L 300 mm of the same profile, back to back, 2+2 bolts M10 cl. 8.8, at 300 mm from the lower end of the rafter, where the moment is small. Bolt: 3.87 kN vs 18.00 kN (22%), plate 4%. Rafter splice — engineer to check: the plate's eccentricity, the C-channel's torsion and the axial force are not included.Chernihiv: Rafter 6 054 mm is longer than the 6 000 mm stock length — 2 pieces: Кр1а 5 760, Кр1б 294 mm. Splice — plate Н1 L 300 mm of the same profile, back to back, 2+2 bolts M10 cl. 8.8, at 5 760 mm from the lower end of the rafter, where the moment is small. Bolt: 5.35 kN vs 22.27 kN (24%), plate 11%. Rafter splice — engineer to check: the plate's eccentricity, the C-channel's torsion and the axial force are not included.

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,68717
П2Rear postTube 60×60×24,44317
Кр1аRafter (inclined beam)C-channel 100×50×2.530017
Кр1бRafter (inclined beam)C-channel 100×50×2.55,75417
Н1Rafter splice plateC-channel 100×50×2.530017
Пк1Frame strutC-channel 41×41×2.52,55417
Пк2Front frame strutC-channel 41×41×2.53,38217
Х1Longitudinal brace (cross)C-channel 41×41×2.52,8544
Р1Purlin (rail)C-channel 41×41×2.56,0003
Р2Purlin (rail)C-channel 41×41×2.56,0003
Р3Purlin (rail)C-channel 41×41×2.56,0003
Р4Purlin (rail)C-channel 41×41×2.56,0003
Р5Purlin (rail)C-channel 41×41×2.56,0003
Р6Purlin (rail)C-channel 41×41×2.56,0003
Р7Purlin (rail)C-channel 41×41×2.55,2003
Р8Purlin (rail)C-channel 41×41×2.55,2003
—Bolt M10×80 / M10×25 set · frame and struts / purlins, braces, connectors——89
—Bolt M10×65 set · brace crossing——2
—Bolt M10×90 set · strut to post — through spacer inserts——17
—Bolt M10×110 set · brace to post — through spacer inserts——4
—Bolt M10×120 set · purlin to rafter——102
—Bolt M10×130 set · post–rafter, strut to post — through spacer inserts——85
—Bolt M10×140 set · strut to rafter — through spacer inserts——17
—Bolt M10×160 set · brace to post — through spacer inserts——4
—Bolt M10×25 set · rafter splice (plate Н1)——68
—End clamp 30 mm——12
—Mid clamp (30–40 mm)——114
—Bolt M8×50 + channel nut——126
—Concrete for 34 posts, Ø350×1300——4.68 m³

Profile cutting

88 bars of 6,000 mm, 480.8 m of profile in total.

  • Tube 60×60×226 bars
  • C-channel 100×50×2.519 bars
  • C-channel 41×41×2.543 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
180,476₴
With installation and delivery
269,148₴
Per 1 kW
7,603UAH/kW

Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

All 28 lines of the engine's estimate, with prices
ItemQuantityPrice, UAHSum, UAH
Tube 60×60×2, stock length 6 000 mm26 bar21032,760
C-channel 100×50×2.5, stock length 6 000 mm19 bar38043,320
C-channel 41×41×2.5, stock length 6 000 mm43 bar20051,600
C-channel connector (splice plate L 300)18 pcs901,620
Bolt M10×80 cl. 8.8 set — frame, struts17 pcs22374
Bolt M10×25 cl. 8.8 set — purlins, braces, connectors72 pcs221,584
Bolt M10×65 cl. 8.8 set — brace crossing2 pcs2754
Bolt M10×90 cl. 8.8 set — strut to post — through spacer inserts17 pcs27459
Bolt M10×110 cl. 8.8 set — brace to post — through spacer inserts4 pcs27108
Bolt M10×120 cl. 8.8 set — purlin to rafter141 pcs273,807
Bolt M10×130 cl. 8.8 set — post–rafter, strut to post — through spacer inserts85 pcs272,295
Bolt M10×140 cl. 8.8 set — strut to rafter — through spacer inserts17 pcs27459
Bolt M10×160 cl. 8.8 set — brace to post — through spacer inserts4 pcs27108
Bolt M10×25 cl. 8.8 set — rafter splice (plate Н1)68 pcs221,496
End clamp 30 mm12 pcs35420
Mid clamp (30–40 mm)114 pcs323,648
Bolt M8×50 A2 + spring channel nut M8139 pcs141,946
Post base anchor pin (M10 / rebar Ø12)34 pcs20680
Borehole casing (roofing felt / PVC, 300 mm)34 pcs602,040
Crushed stone 20–40 for the bottom of the boreholes0.33 m³900297
Earth electrode: 2 rods Ø16×1.5 m + strip 40×41 set1,5001,500
Wire PV-3 6 mm² green-yellow63 m352,205
Module earthing clip (under the clamp)60 pcs201,200
Cable clip, stainless180 pcs5900
Zinc paint / cold galvanising spray 400 ml6 pcs3502,100
Concrete M200 for posts4.68 m³3,80017,784
Rebar Ø10 (4 bars per post)204 m285,712
Spacer inserts / packs — pieces of the same profile (from offcuts): 4 × 71 mm, 17 × 70 mm, 17 × 50 mm, 4 × 30 mm, 17 × 10 mm59 pcs00
Materials180,476

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 40,313 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.

Other layouts of this panel

The 3×20 layout with other panels

Next