Section of the table from the Solispec engine (median zone — Cherkasy)

Yingli

Ground frame for 30 Yingli PANDA 3.0 Pro YL590CF72e/2 panels (3×10)

3 rows of 10 panels, 17.70 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
17.70kW
Steel
738.0kg
Posts
16
Bolts
244
Materials
94,519₴
Yield
20,156kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the Yingli PANDA 3.0 Pro YL590CF72e/2 panel and the 3 × 10 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersC-channel 100×50×2.5C-channel 100×50×2.5C-channel 100×50×2.5
Purlins and bracesC-channel 60×40×2C-channel 60×40×2C-channel 60×40×2
Frames6 frames, pitch up to 2,200 mm8 frames, pitch up to 1,600 mm8 frames, pitch up to 1,600 mm
Posts121616
Footings (bored concrete)12 pcs, Ø500 mm, depth 1,500 mm16 pcs, Ø400 mm, depth 1,300 mm16 pcs, Ø350 mm, depth 1,500 mm
Concrete3.89 m³2.88 m³2.54 m³
Tilt30°30°30°
Panel bottom / post top600 / 3,101 mm600 / 3,101 mm600 / 3,101 mm
Panel field size11,660 × 4,552 mm11,660 × 4,552 mm11,660 × 4,552 mm
Row spacing between tables (no shade on 21 December)15,420 mm at noon · 17,340 mm ±2 h17,090 mm at noon · 19,740 mm ±2 h18,730 mm at noon · 22,260 mm ±2 h
Steel619.1 kg738.0 kg749.5 kg
BoltsM10 — 142, M8 — 66M10 — 178, M8 — 66M10 — 178, M8 — 66
Panel clampsend 12, middle 54end 12, middle 54end 12, middle 54
Materials87,848 UAH94,519 UAH93,546 UAH
With installation and delivery133,093 UAH139,663 UAH138,690 UAH
Per 1 kW7,519 UAH/kW7,891 UAH/kW7,836 UAH/kW
Yield1,266 kWh/kW · 22,416 kWh/year1,139 kWh/kW · 20,156 kWh/year1,043 kWh/kW · 18,463 kWh/year
Strength σ/fy80%57%61%
Deflection / (L/200)70%36%38%
Rafter strength89%87%93%
Post utilisation46%44%48%
Utilisation96%93%92%
Depth vs frost depthokokok
Bolt utilisation24%23%25%
Plate section5%5%5%
Not includedengineer to checkengineer to checkengineer to check
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Kherson: Frame spacing 2 200 mm, 6 frames. Purlin C-channel 60×40×2: strength 80%, deflection 70% of L/200 (snow on panel 489 Pa).
  • Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Kherson: Rafter C-channel 100×50×2.5: span between posts 3 511, cantilever 1 271 mm → strength 89%.Cherkasy: Rafter C-channel 100×50×2.5: span between posts 3 511, cantilever 1 271 mm → strength 87%.Chernihiv: Rafter C-channel 100×50×2.5: span between posts 3 511, cantilever 1 271 mm → strength 93%.
  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø500 × 1 500: 0.295 m³ of concrete per post. Wind uplift on the front post ≈ 23.0 kN (with γ=1.5) vs ≈ 24.0 kN (concrete weight + soil friction, estimate) → 96%.Cherkasy: Foundation Ø400 × 1 300: 0.163 m³ of concrete per post. Wind uplift on the front post ≈ 14.7 kN (with γ=1.5) vs ≈ 15.8 kN (concrete weight + soil friction, estimate) → 93%.Chernihiv: Foundation Ø350 × 1 500: 0.144 m³ of concrete per post. Wind uplift on the front post ≈ 14.3 kN (with γ=1.5) vs ≈ 15.5 kN (concrete weight + soil friction, estimate) → 92%.
  • Stock length, mmKherson: Rafter 6 054 mm is longer than the 6 000 mm stock length — 2 pieces: Кр1а 5 760, Кр1б 294 mm. Splice — plate Н1 L 300 mm of the same profile, back to back, 2+2 bolts M10 cl. 8.8, at 5 760 mm from the lower end of the rafter, where the moment is small. Bolt: 4.35 kN vs 18.00 kN (24%), plate 5%. Rafter splice — engineer to check: the plate's eccentricity, the C-channel's torsion and the axial force are not included.Cherkasy: Rafter 6 054 mm is longer than the 6 000 mm stock length — 2 pieces: Кр1а 5 760, Кр1б 294 mm. Splice — plate Н1 L 300 mm of the same profile, back to back, 2+2 bolts M10 cl. 8.8, at 5 760 mm from the lower end of the rafter, where the moment is small. Bolt: 4.23 kN vs 18.00 kN (23%), plate 5%. Rafter splice — engineer to check: the plate's eccentricity, the C-channel's torsion and the axial force are not included.Chernihiv: Rafter 6 054 mm is longer than the 6 000 mm stock length — 2 pieces: Кр1а 5 760, Кр1б 294 mm. Splice — plate Н1 L 300 mm of the same profile, back to back, 2+2 bolts M10 cl. 8.8, at 5 760 mm from the lower end of the rafter, where the moment is small. Bolt: 4.53 kN vs 18.00 kN (25%), plate 5%. Rafter splice — engineer to check: the plate's eccentricity, the C-channel's torsion and the axial force are not included.

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,6708
П2Rear postTube 60×60×24,4268
Кр1аRafter (inclined beam)C-channel 100×50×2.55,7608
Кр1бRafter (inclined beam)C-channel 100×50×2.52948
Н1Rafter splice plateC-channel 100×50×2.53008
Пк1Frame strutC-channel 60×40×22,5418
Пк2Front frame strutC-channel 60×40×23,3708
Х1Longitudinal brace (cross)C-channel 60×40×22,9354
Р1Purlin (rail)C-channel 60×40×26,0003
Р2Purlin (rail)C-channel 60×40×26,0003
Р3Purlin (rail)C-channel 60×40×25,6603
Р4Purlin (rail)C-channel 60×40×25,6603
—Bolt M10×80 / M10×25 set · frame and struts / purlins, braces, connectors——34
—Bolt M10×90 set · strut to post — through spacer inserts——8
—Bolt M10×120 set · purlin to rafter——48
—Bolt M10×130 set · post–rafter, strut to post — through spacer inserts——40
—Bolt M10×140 set · strut to rafter — through spacer inserts——8
—Bolt M10×150 set · brace to post — through spacer inserts——8
—Bolt M10×25 set · rafter splice (plate Н1)——32
—End clamp 30 mm——12
—Mid clamp (30–40 mm)——54
—Bolt M8×50 + channel nut——66
—Concrete for 16 posts, Ø400×1300——2.88 m³

Profile cutting

43 bars of 6,000 mm, 236.6 m of profile in total.

  • Tube 60×60×212 bars
  • C-channel 100×50×2.59 bars
  • C-channel 60×40×222 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
94,519₴
With installation and delivery
139,663₴
Per 1 kW
7,891UAH/kW

Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

All 26 lines of the engine's estimate, with prices
ItemQuantityPrice, UAHSum, UAH
Tube 60×60×2, stock length 6 000 mm12 bar21015,120
C-channel 100×50×2.5, stock length 6 000 mm9 bar38020,520
C-channel 60×40×2, stock length 6 000 mm22 bar23030,360
C-channel connector (splice plate L 300)6 pcs90540
Bolt M10×80 cl. 8.8 set — frame, struts8 pcs22176
Bolt M10×25 cl. 8.8 set — purlins, braces, connectors26 pcs22572
Bolt M10×90 cl. 8.8 set — strut to post — through spacer inserts8 pcs27216
Bolt M10×120 cl. 8.8 set — purlin to rafter66 pcs271,782
Bolt M10×130 cl. 8.8 set — post–rafter, strut to post — through spacer inserts40 pcs271,080
Bolt M10×140 cl. 8.8 set — strut to rafter — through spacer inserts8 pcs27216
Bolt M10×150 cl. 8.8 set — brace to post — through spacer inserts8 pcs27216
Bolt M10×25 cl. 8.8 set — rafter splice (plate Н1)32 pcs22704
End clamp 30 mm12 pcs35420
Mid clamp (30–40 mm)54 pcs321,728
Bolt M8×50 A2 + spring channel nut M873 pcs141,022
Post base anchor pin (M10 / rebar Ø12)16 pcs20320
Borehole casing (roofing felt / PVC, 300 mm)16 pcs60960
Crushed stone 20–40 for the bottom of the boreholes0.20 m³900180
Earth electrode: 2 rods Ø16×1.5 m + strip 40×41 set1,5001,500
Wire PV-3 6 mm² green-yellow33 m351,155
Module earthing clip (under the clamp)30 pcs20600
Cable clip, stainless90 pcs5450
Zinc paint / cold galvanising spray 400 ml3 pcs3501,050
Concrete M200 for posts2.88 m³3,80010,944
Rebar Ø10 (4 bars per post)96 m282,688
Spacer inserts / packs — pieces of the same profile (from offcuts): 4 × 71 mm, 8 × 70 mm, 8 × 50 mm, 4 × 30 mm, 8 × 10 mm32 pcs00
Materials94,519

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 20,156 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.