Section of the table from the Solispec engine (median zone — Cherkasy)

Trina

Ground frame for 40 Trina Vertex S+ TSM-500NEG18R.28 panels (4×10)

4 rows of 10 panels, 20.00 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
20.00kW
Steel
1,369.0kg
Posts
27
Bolts
328
Materials
149,627₴
Yield
22,776kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the Trina Vertex S+ TSM-500NEG18R.28 panel and the 4 × 10 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 80×80×3Tube 80×80×3Tube 80×80×3
RaftersTube 60×60×2Tube 60×60×2C-channel 100×50×2.5
Purlins and bracesC-channel 41×41×2.5C-channel 41×41×2.5C-channel 41×41×2.5
Frames7 frames, pitch up to 1,850 mm9 frames, pitch up to 1,400 mm8 frames, pitch up to 1,600 mm
Posts212724
Footings (bored concrete)21 pcs, Ø450 mm, depth 1,700 mm27 pcs, Ø400 mm, depth 1,300 mm24 pcs, Ø400 mm, depth 1,500 mm
Concrete6.25 m³4.85 m³4.98 m³
Tilt30°30°30°
Panel bottom / post top600 / 3,797 mm600 / 3,797 mm600 / 3,780 mm
Panel field size11,660 × 5,679 mm11,660 × 5,679 mm11,660 × 5,689 mm
Row spacing between tables (no shade on 21 December)17,730 mm at noon · 19,940 mm ±2 h19,650 mm at noon · 22,690 mm ±2 h21,540 mm at noon · 25,590 mm ±2 h
Steel1,187.6 kg1,369.0 kg1,296.7 kg
BoltsM10 — 196, M8 — 88M10 — 240, M8 — 88M10 — 218, M8 — 88
Panel clampsend 16, middle 72end 16, middle 72end 16, middle 72
Materials135,336 UAH149,627 UAH150,913 UAH
With installation and delivery186,796 UAH201,131 UAH201,635 UAH
Per 1 kW9,340 UAH/kW10,057 UAH/kW10,082 UAH/kW
Yield1,266 kWh/kW · 25,329 kWh/year1,139 kWh/kW · 22,776 kWh/year1,043 kWh/kW · 20,863 kWh/year
Strength σ/fy90%68%95%
Deflection / (L/200)82%47%75%
Rafter strength98%99%64%
Post utilisation20%20%25%
Post utilisation П37%7%8%
Utilisation97%97%94%
Depth vs frost depthokokok
Bolt utilisation19%19%29%
Plate section1%1%0%
Not includedengineer to checkengineer to checkengineer to check
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Kherson: Frame spacing 1 850 mm, 7 frames. Purlin C-channel 41×41×2.5: strength 90%, deflection 82% of L/200 (snow on panel 489 Pa).Chernihiv: Frame spacing 1 600 mm, 8 frames. Purlin C-channel 41×41×2.5: strength 95%, deflection 75% of L/200 (snow on panel 1 106 Pa).
  • Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Kherson: Rafter · Tube 60×60×2 · 3 posts, spans between posts 2 565 mm, cantilever 1 047 mm — continuous beam on 3 supports → strength 98%.Cherkasy: Rafter · Tube 60×60×2 · 3 posts, spans between posts 2 565 mm, cantilever 1 047 mm — continuous beam on 3 supports → strength 99%.
  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø450 × 1 700: 0.270 m³ of concrete per post. Wind uplift on the front post ≈ 23.1 kN (with γ=1.5) vs ≈ 23.9 kN (concrete weight + soil friction, estimate) → 97%.Cherkasy: Foundation Ø400 × 1 300: 0.163 m³ of concrete per post. Wind uplift on the front post ≈ 15.3 kN (with γ=1.5) vs ≈ 15.8 kN (concrete weight + soil friction, estimate) → 97%.Chernihiv: Foundation Ø400 × 1 500: 0.188 m³ of concrete per post. Wind uplift on the front post ≈ 17.1 kN (with γ=1.5) vs ≈ 18.2 kN (concrete weight + soil friction, estimate) → 94%.
  • Stock length, mmKherson: Rafter 7 224 mm is longer than the 6 000 mm stock length — 2 pieces: Кр1а 5 640, Кр1б 1 584 mm. Splice — plate Н1 L 300 mm of the same profile, back to back, 2+2 bolts M10 cl. 8.8, at 5 640 mm from the lower end of the rafter, where the moment is small. Bolt: 4.23 kN vs 22.27 kN (19%), plate 1%. Rafter splice — engineer to check: the plate's eccentricity, the C-channel's torsion and the axial force are not included.Cherkasy: Rafter 7 224 mm is longer than the 6 000 mm stock length — 2 pieces: Кр1а 5 640, Кр1б 1 584 mm. Splice — plate Н1 L 300 mm of the same profile, back to back, 2+2 bolts M10 cl. 8.8, at 5 640 mm from the lower end of the rafter, where the moment is small. Bolt: 4.25 kN vs 22.27 kN (19%), plate 1%. Rafter splice — engineer to check: the plate's eccentricity, the C-channel's torsion and the axial force are not included.Chernihiv: Rafter 7 224 mm is longer than the 6 000 mm stock length — 2 pieces: Кр1а 5 640, Кр1б 1 584 mm. Splice — plate Н1 L 300 mm of the same profile, back to back, 2+2 bolts M10 cl. 8.8, at 5 640 mm from the lower end of the rafter, where the moment is small. Bolt: 5.19 kN vs 18.00 kN (29%), plate 0%. Rafter splice — engineer to check: the plate's eccentricity, the C-channel's torsion and the axial force are not included.

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 80×80×32,5579
П2Rear postTube 80×80×35,1229
П3Middle postTube 80×80×33,8409
Кр1аRafter (inclined beam)Tube 60×60×25,6409
Кр1бRafter (inclined beam)Tube 60×60×21,5849
Н1Rafter splice plateTube 60×60×23009
Пк1Frame strutC-channel 41×41×2.53,1619
Пк2Front frame strutC-channel 41×41×2.52,0179
Х1Longitudinal brace (cross)C-channel 41×41×2.53,4494
Р1Purlin (rail)C-channel 41×41×2.56,0004
Р2Purlin (rail)C-channel 41×41×2.56,0004
Р3Purlin (rail)C-channel 41×41×2.55,6604
Р4Purlin (rail)C-channel 41×41×2.55,6604
—Bolt M10×160 / M10×80 set · frame and struts / purlins, braces, connectors——196
—Bolt M10×120 set · brace to post — through spacer inserts——4
—Bolt M10×180 set · brace to post — through spacer inserts——4
—Bolt M10×140 set · rafter splice (plate Н1)——36
—End clamp 30 mm——16
—Mid clamp (30–40 mm)——72
—Bolt M8×50 + channel nut——88
—Concrete for 27 posts, Ø400×1300——4.85 m³

Profile cutting

64 bars of 6,000 mm, 325.1 m of profile in total.

  • Tube 80×80×323 bars
  • Tube 60×60×212 bars
  • C-channel 41×41×2.529 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
149,627₴
With installation and delivery
201,131₴
Per 1 kW
10,057UAH/kW

Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

All 23 lines of the engine's estimate, with prices
ItemQuantityPrice, UAHSum, UAH
Tube 80×80×3, stock length 6 000 mm23 bar42057,960
Tube 60×60×2, stock length 6 000 mm12 bar21015,120
C-channel 41×41×2.5, stock length 6 000 mm29 bar20034,800
C-channel connector (splice plate L 300)8 pcs90720
Bolt M10×160 cl. 8.8 set — frame, struts90 pcs221,980
Bolt M10×80 cl. 8.8 set — purlins, braces, connectors130 pcs222,860
Bolt M10×120 cl. 8.8 set — brace to post — through spacer inserts4 pcs27108
Bolt M10×180 cl. 8.8 set — brace to post — through spacer inserts4 pcs27108
Bolt M10×140 cl. 8.8 set — rafter splice (plate Н1)36 pcs22792
End clamp 30 mm16 pcs35560
Mid clamp (30–40 mm)72 pcs322,304
Bolt M8×50 A2 + spring channel nut M897 pcs141,358
Post base anchor pin (M10 / rebar Ø12)27 pcs20540
Borehole casing (roofing felt / PVC, 300 mm)27 pcs601,620
Crushed stone 20–40 for the bottom of the boreholes0.34 m³900306
Earth electrode: 2 rods Ø16×1.5 m + strip 40×41 set1,5001,500
Wire PV-3 6 mm² green-yellow35 m351,225
Module earthing clip (under the clamp)40 pcs20800
Cable clip, stainless120 pcs5600
Zinc paint / cold galvanising spray 400 ml4 pcs3501,400
Concrete M200 for posts4.85 m³3,80018,430
Rebar Ø10 (4 bars per post)162 m284,536
Spacer inserts / packs — pieces of the same profile (from offcuts): 18 × 80 mm, 4 × 61 mm, 4 × 20 mm26 pcs00
Materials149,627

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 22,776 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.

Other layouts of this panel

The 4×10 layout with other panels