Section of the table from the Solispec engine (median zone — Cherkasy)

Seraphim

Ground frame for 60 Seraphim Sable SRP-440-BTD-BG panels (3×20)

3 rows of 20 panels, 26.40 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
26.40kW
Steel
1,240.3kg
Posts
34
Bolts
446
Materials
136,448₴
Yield
30,064kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the Seraphim Sable SRP-440-BTD-BG panel and the 3 × 20 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersTube 60×60×2Tube 60×60×2C-channel 100×50×2.5
Purlins and bracesC-channel 41×41×2.5C-channel 41×41×2.5C-channel 60×40×2
Frames14 frames, pitch up to 1,740 mm17 frames, pitch up to 1,420 mm11 frames, pitch up to 2,250 mm
Posts283422
Footings (bored concrete)28 pcs, Ø400 mm, depth 1,100 mm34 pcs, Ø300 mm, depth 1,100 mm22 pcs, Ø350 mm, depth 1,500 mm
Concrete4.26 m³2.91 m³3.49 m³
Tilt30°30°30°
Panel bottom / post top600 / 2,514 mm600 / 2,514 mm600 / 2,480 mm
Panel field size23,200 × 3,457 mm23,200 × 3,457 mm23,200 × 3,476 mm
Row spacing between tables (no shade on 21 December)11,680 mm at noon · 13,130 mm ±2 h12,940 mm at noon · 14,950 mm ±2 h14,190 mm at noon · 16,860 mm ±2 h
Steel1,091.8 kg1,240.3 kg987.7 kg
BoltsM10 — 278, M8 — 126M10 — 320, M8 — 126M10 — 236, M8 — 126
Panel clampsend 12, middle 114end 12, middle 114end 12, middle 114
Materials127,582 UAH136,448 UAH136,485 UAH
With installation and delivery194,994 UAH203,845 UAH203,230 UAH
Per 1 kW7,386 UAH/kW7,721 UAH/kW7,698 UAH/kW
Yield1,266 kWh/kW · 33,434 kWh/year1,139 kWh/kW · 30,064 kWh/year1,043 kWh/kW · 27,539 kWh/year
Strength σ/fy66%59%89%
Deflection / (L/200)57%42%79%
Rafter strength76%84%75%
Post utilisation20%22%36%
Utilisation96%97%91%
Depth vs frost depthokokok
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø400 × 1 100: 0.138 m³ of concrete per post. Wind uplift on the front post ≈ 12.8 kN (with γ=1.5) vs ≈ 13.4 kN (concrete weight + soil friction, estimate) → 96%.Cherkasy: Foundation Ø300 × 1 100: 0.078 m³ of concrete per post. Wind uplift on the front post ≈ 9.1 kN (with γ=1.5) vs ≈ 9.5 kN (concrete weight + soil friction, estimate) → 97%.Chernihiv: Foundation Ø350 × 1 500: 0.144 m³ of concrete per post. Wind uplift on the front post ≈ 14.2 kN (with γ=1.5) vs ≈ 15.5 kN (concrete weight + soil friction, estimate) → 91%.
  • Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Cherkasy: Rafter Tube 60×60×2: span between posts 2 695, cantilever 976 mm → strength 84%.
  • Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Chernihiv: Frame spacing 2 250 mm, 11 frames. Purlin C-channel 60×40×2: strength 89%, deflection 79% of L/200 (snow on panel 1 106 Pa).

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,29117
П2Rear postTube 60×60×23,63917
Кр1Rafter (inclined beam)Tube 60×60×24,64617
Пк1Frame strutC-channel 41×41×2.52,02217
Пк2Front frame strutC-channel 41×41×2.52,65317
Х1Longitudinal brace (cross)C-channel 41×41×2.52,3534
Р1Purlin (rail)C-channel 41×41×2.56,0003
Р2Purlin (rail)C-channel 41×41×2.56,0003
Р3Purlin (rail)C-channel 41×41×2.56,0003
Р4Purlin (rail)C-channel 41×41×2.56,0003
Р5Purlin (rail)C-channel 41×41×2.56,0003
Р6Purlin (rail)C-channel 41×41×2.56,0003
Р7Purlin (rail)C-channel 41×41×2.55,2003
Р8Purlin (rail)C-channel 41×41×2.55,2003
—Bolt M10×140 / M10×80 set · frame and struts / purlins, braces, connectors——295
—Bolt M10×110 set · brace to post — through spacer inserts——4
—Bolt M10×150 set · strut to rafter — through spacer inserts——17
—Bolt M10×160 set · brace to post — through spacer inserts——4
—End clamp 30 mm——12
—Mid clamp (30–40 mm)——114
—Bolt M8×50 + channel nut——126
—Concrete for 34 posts, Ø300×1100——2.91 m³

Profile cutting

77 bars of 6,000 mm, 407.9 m of profile in total.

  • Tube 60×60×234 bars
  • C-channel 41×41×2.543 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
136,448₴
With installation and delivery
203,845₴
Per 1 kW
7,721UAH/kW

Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

All 22 lines of the engine's estimate, with prices
ItemQuantityPrice, UAHSum, UAH
Tube 60×60×2, stock length 6 000 mm34 bar21042,840
C-channel 41×41×2.5, stock length 6 000 mm43 bar20051,600
C-channel connector (splice plate L 300)18 pcs901,620
Bolt M10×140 cl. 8.8 set — frame, struts119 pcs222,618
Bolt M10×80 cl. 8.8 set — purlins, braces, connectors208 pcs224,576
Bolt M10×110 cl. 8.8 set — brace to post — through spacer inserts4 pcs27108
Bolt M10×150 cl. 8.8 set — strut to rafter — through spacer inserts17 pcs27459
Bolt M10×160 cl. 8.8 set — brace to post — through spacer inserts4 pcs27108
End clamp 30 mm12 pcs35420
Mid clamp (30–40 mm)114 pcs323,648
Bolt M8×50 A2 + spring channel nut M8139 pcs141,946
Post base anchor pin (M10 / rebar Ø12)34 pcs20680
Borehole casing (roofing felt / PVC, 300 mm)34 pcs602,040
Crushed stone 20–40 for the bottom of the boreholes0.24 m³900216
Earth electrode: 2 rods Ø16×1.5 m + strip 40×41 set1,5001,500
Wire PV-3 6 mm² green-yellow63 m352,205
Module earthing clip (under the clamp)60 pcs201,200
Cable clip, stainless180 pcs5900
Zinc paint / cold galvanising spray 400 ml5 pcs3501,750
Concrete M200 for posts2.91 m³3,80011,058
Rebar Ø10 (4 bars per post)177 m284,956
Spacer inserts / packs — pieces of the same profile (from offcuts): 4 × 71 mm, 17 × 70 mm, 17 × 60 mm, 4 × 30 mm, 17 × 10 mm59 pcs00
Materials136,448

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 30,064 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.