Section of the table from the Solispec engine (median zone — Cherkasy)

Seraphim

Ground frame for 10 Seraphim Sable SRP-440-BTD-BG panels (2×5)

2 rows of 5 panels, 4.40 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
4.40kW
Steel
213.1kg
Posts
8
Bolts
74
Materials
25,741₴
Yield
5,011kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the Seraphim Sable SRP-440-BTD-BG panel and the 2 × 5 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersTube 60×60×2Tube 60×60×2Tube 60×60×2
Purlins and bracesC-channel 41×41×2.5C-channel 41×41×2.5C-channel 41×41×2.5
Frames4 frames, pitch up to 1,780 mm4 frames, pitch up to 1,780 mm4 frames, pitch up to 1,780 mm
Posts888
Footings (bored concrete)8 pcs, Ø300 mm, depth 1,100 mm8 pcs, Ø300 mm, depth 1,100 mm8 pcs, Ø300 mm, depth 1,300 mm
Concrete0.68 m³0.68 m³0.81 m³
Tilt30°30°30°
Panel bottom / post top600 / 1,826 mm600 / 1,826 mm600 / 1,826 mm
Panel field size5,890 × 2,265 mm5,890 × 2,265 mm5,890 × 2,265 mm
Row spacing between tables (no shade on 21 December)7,770 mm at noon · 8,740 mm ±2 h8,610 mm at noon · 9,950 mm ±2 h9,440 mm at noon · 11,220 mm ±2 h
Steel213.1 kg213.1 kg218.8 kg
BoltsM10 — 50, M8 — 24M10 — 50, M8 — 24M10 — 50, M8 — 24
Panel clampsend 8, middle 16end 8, middle 16end 8, middle 16
Materials25,741 UAH25,741 UAH26,403 UAH
With installation and delivery38,181 UAH38,181 UAH38,843 UAH
Per 1 kW8,678 UAH/kW8,678 UAH/kW8,828 UAH/kW
Yield1,266 kWh/kW · 5,572 kWh/year1,139 kWh/kW · 5,011 kWh/year1,043 kWh/kW · 4,590 kWh/year
Strength σ/fy65%90%97%
Deflection / (L/200)58%79%85%
Rafter strength29%40%43%
Post utilisation9%13%14%
Utilisation83%73%60%
Depth vs frost depthokokok
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø300 × 1 100: 0.078 m³ of concrete per post. Wind uplift on the front post ≈ 7.8 kN (with γ=1.5) vs ≈ 9.5 kN (concrete weight + soil friction, estimate) → 83%.
  • Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Cherkasy: Frame spacing 1 780 mm, 4 frames. Purlin C-channel 41×41×2.5: strength 90%, deflection 79% of L/200 (snow on panel 977 Pa).Chernihiv: Frame spacing 1 780 mm, 4 frames. Purlin C-channel 41×41×2.5: strength 97%, deflection 85% of L/200 (snow on panel 1 106 Pa).

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,1084
П2Rear postTube 60×60×22,9514
Кр1Rafter (inclined beam)Tube 60×60×22,9044
Пк1Frame strutC-channel 41×41×2.51,4164
Х1Longitudinal brace (cross)C-channel 41×41×2.52,1564
Р1Purlin (rail)C-channel 41×41×2.55,8904
—Bolt M10×140 / M10×80 set · frame and struts / purlins, braces, connectors——38
—Bolt M10×110 set · brace to post — through spacer inserts——4
—Bolt M10×150 set · strut to rafter — through spacer inserts——4
—Bolt M10×160 set · brace to post — through spacer inserts——4
—End clamp 30 mm——8
—Mid clamp (30–40 mm)——16
—Bolt M8×50 + channel nut——24
—Concrete for 8 posts, Ø300×1100——0.68 m³

Profile cutting

13 bars of 6,000 mm, 69.7 m of profile in total.

  • Tube 60×60×26 bars
  • C-channel 41×41×2.57 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
25,741₴
With installation and delivery
38,181₴
Per 1 kW
8,678UAH/kW

Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

All 21 lines of the engine's estimate, with prices
ItemQuantityPrice, UAHSum, UAH
Tube 60×60×2, stock length 6 000 mm6 bar2107,560
C-channel 41×41×2.5, stock length 6 000 mm7 bar2008,400
Bolt M10×140 cl. 8.8 set — frame, struts26 pcs22572
Bolt M10×80 cl. 8.8 set — purlins, braces, connectors18 pcs22396
Bolt M10×110 cl. 8.8 set — brace to post — through spacer inserts4 pcs27108
Bolt M10×150 cl. 8.8 set — strut to rafter — through spacer inserts4 pcs27108
Bolt M10×160 cl. 8.8 set — brace to post — through spacer inserts4 pcs27108
End clamp 30 mm8 pcs35280
Mid clamp (30–40 mm)16 pcs32512
Bolt M8×50 A2 + spring channel nut M827 pcs14378
Post base anchor pin (M10 / rebar Ø12)8 pcs20160
Borehole casing (roofing felt / PVC, 300 mm)8 pcs60480
Crushed stone 20–40 for the bottom of the boreholes0.06 m³90054
Earth electrode: 2 rods Ø16×1.5 m + strip 40×41 set1,5001,500
Wire PV-3 6 mm² green-yellow19 m35665
Module earthing clip (under the clamp)10 pcs20200
Cable clip, stainless30 pcs5150
Zinc paint / cold galvanising spray 400 ml1 pcs350350
Concrete M200 for posts0.68 m³3,8002,584
Rebar Ø10 (4 bars per post)42 m281,176
Spacer inserts / packs — pieces of the same profile (from offcuts): 4 × 71 mm, 4 × 70 mm, 4 × 30 mm, 4 × 10 mm16 pcs00
Materials25,741

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 5,011 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.

Other layouts of this panel

The 2×5 layout with other panels