Section of the table from the Solispec engine (median zone — Cherkasy)

REC

Ground frame for 60 REC Alpha Pure 2 REC420AA Pure 2 (HJT) panels (3×20)

3 rows of 20 panels, 25.20 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
25.20kW
Steel
1,087.6kg
Posts
26
Bolts
390
Materials
140,238₴
Yield
28,697kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the REC Alpha Pure 2 REC420AA Pure 2 (HJT) panel and the 3 × 20 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersTube 60×60×2C-channel 100×50×2.5C-channel 100×50×2.5
Purlins and bracesC-channel 41×41×2.5C-channel 41×41×2.5C-channel 60×40×2
Frames15 frames, pitch up to 1,490 mm13 frames, pitch up to 1,730 mm12 frames, pitch up to 1,890 mm
Posts302624
Footings (bored concrete)30 pcs, Ø400 mm, depth 1,100 mm26 pcs, Ø350 mm, depth 1,300 mm24 pcs, Ø350 mm, depth 1,300 mm
Concrete4.56 m³3.58 m³3.30 m³
Tilt30°30°30°
Panel bottom / post top600 / 2,674 mm600 / 2,657 mm600 / 2,641 mm
Panel field size21,320 × 3,735 mm21,320 × 3,745 mm21,320 × 3,755 mm
Row spacing between tables (no shade on 21 December)12,640 mm at noon · 14,210 mm ±2 h14,010 mm at noon · 16,180 mm ±2 h15,360 mm at noon · 18,250 mm ±2 h
Steel1,156.8 kg1,087.6 kg1,030.5 kg
BoltsM10 — 292, M8 — 126M10 — 264, M8 — 126M10 — 250, M8 — 126
Panel clampsend 12, middle 114end 12, middle 114end 12, middle 114
Materials139,746 UAH140,238 UAH138,328 UAH
With installation and delivery204,131 UAH203,708 UAH202,030 UAH
Per 1 kW8,100 UAH/kW8,084 UAH/kW8,017 UAH/kW
Yield1,266 kWh/kW · 31,914 kWh/year1,139 kWh/kW · 28,697 kWh/year1,043 kWh/kW · 26,287 kWh/year
Strength σ/fy53%96%68%
Deflection / (L/200)39%82%51%
Rafter strength77%63%74%
Post utilisation20%31%36%
Utilisation91%92%98%
Depth vs frost depthokokok
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø400 × 1 100: 0.138 m³ of concrete per post. Wind uplift on the front post ≈ 12.1 kN (with γ=1.5) vs ≈ 13.4 kN (concrete weight + soil friction, estimate) → 91%.Cherkasy: Foundation Ø350 × 1 300: 0.125 m³ of concrete per post. Wind uplift on the front post ≈ 12.3 kN (with γ=1.5) vs ≈ 13.4 kN (concrete weight + soil friction, estimate) → 92%.Chernihiv: Foundation Ø350 × 1 300: 0.125 m³ of concrete per post. Wind uplift on the front post ≈ 13.1 kN (with γ=1.5) vs ≈ 13.4 kN (concrete weight + soil friction, estimate) → 98%.
  • Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Cherkasy: Frame spacing 1 730 mm, 13 frames. Purlin C-channel 41×41×2.5: strength 96%, deflection 82% of L/200 (snow on panel 977 Pa).

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,52813
П2Rear postTube 60×60×23,98213
Кр1Rafter (inclined beam)C-channel 100×50×2.55,01513
Пк1Frame strutC-channel 41×41×2.52,15013
Пк2Front frame strutC-channel 41×41×2.52,83313
Х1Longitudinal brace (cross)C-channel 41×41×2.52,6624
Р1Purlin (rail)C-channel 41×41×2.56,0003
Р2Purlin (rail)C-channel 41×41×2.56,0003
Р3Purlin (rail)C-channel 41×41×2.56,0003
Р4Purlin (rail)C-channel 41×41×2.56,0003
Р5Purlin (rail)C-channel 41×41×2.56,0003
Р6Purlin (rail)C-channel 41×41×2.56,0003
Р7Purlin (rail)C-channel 41×41×2.53,3203
Р8Purlin (rail)C-channel 41×41×2.53,3203
—Bolt M10×80 / M10×25 set · frame and struts / purlins, braces, connectors——85
—Bolt M10×65 set · brace crossing——2
—Bolt M10×90 set · strut to post — through spacer inserts——13
—Bolt M10×110 set · brace to post — through spacer inserts——4
—Bolt M10×120 set · purlin to rafter——78
—Bolt M10×130 set · post–rafter, strut to post — through spacer inserts——65
—Bolt M10×140 set · strut to rafter — through spacer inserts——13
—Bolt M10×160 set · brace to post — through spacer inserts——4
—End clamp 30 mm——12
—Mid clamp (30–40 mm)——114
—Bolt M8×50 + channel nut——126
—Concrete for 26 posts, Ø350×1300——3.58 m³

Profile cutting

69 bars of 6,000 mm, 353.2 m of profile in total.

  • Tube 60×60×220 bars
  • C-channel 100×50×2.513 bars
  • C-channel 41×41×2.536 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
140,238₴
With installation and delivery
203,708₴
Per 1 kW
8,084UAH/kW

Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

All 27 lines of the engine's estimate, with prices
ItemQuantityPrice, UAHSum, UAH
Tube 60×60×2, stock length 6 000 mm20 bar21025,200
C-channel 100×50×2.5, stock length 6 000 mm13 bar38029,640
C-channel 41×41×2.5, stock length 6 000 mm36 bar20043,200
C-channel connector (splice plate L 300)18 pcs901,620
Bolt M10×80 cl. 8.8 set — frame, struts13 pcs22286
Bolt M10×25 cl. 8.8 set — purlins, braces, connectors72 pcs221,584
Bolt M10×65 cl. 8.8 set — brace crossing2 pcs2754
Bolt M10×90 cl. 8.8 set — strut to post — through spacer inserts13 pcs27351
Bolt M10×110 cl. 8.8 set — brace to post — through spacer inserts4 pcs27108
Bolt M10×120 cl. 8.8 set — purlin to rafter105 pcs272,835
Bolt M10×130 cl. 8.8 set — post–rafter, strut to post — through spacer inserts65 pcs271,755
Bolt M10×140 cl. 8.8 set — strut to rafter — through spacer inserts13 pcs27351
Bolt M10×160 cl. 8.8 set — brace to post — through spacer inserts4 pcs27108
End clamp 30 mm12 pcs35420
Mid clamp (30–40 mm)114 pcs323,648
Bolt M8×50 A2 + spring channel nut M8139 pcs141,946
Post base anchor pin (M10 / rebar Ø12)26 pcs20520
Borehole casing (roofing felt / PVC, 300 mm)26 pcs601,560
Crushed stone 20–40 for the bottom of the boreholes0.25 m³900225
Earth electrode: 2 rods Ø16×1.5 m + strip 40×41 set1,5001,500
Wire PV-3 6 mm² green-yellow53 m351,855
Module earthing clip (under the clamp)60 pcs201,200
Cable clip, stainless180 pcs5900
Zinc paint / cold galvanising spray 400 ml4 pcs3501,400
Concrete M200 for posts3.58 m³3,80013,604
Rebar Ø10 (4 bars per post)156 m284,368
Spacer inserts / packs — pieces of the same profile (from offcuts): 4 × 71 mm, 13 × 70 mm, 13 × 50 mm, 4 × 30 mm, 13 × 10 mm47 pcs00
Materials140,238

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 28,697 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.