Section of the table from the Solispec engine (median zone — Cherkasy)

REC

Ground frame for 30 REC Alpha Pure 2 REC420AA Pure 2 (HJT) panels (2×15)

2 rows of 15 panels, 12.60 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
12.60kW
Steel
438.2kg
Posts
16
Bolts
186
Materials
58,393₴
Yield
14,349kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the REC Alpha Pure 2 REC420AA Pure 2 (HJT) panel and the 2 × 15 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersC-channel 60×40×2C-channel 60×40×2C-channel 60×40×2
Purlins and bracesC-channel 60×40×2C-channel 60×40×2C-channel 60×40×2
Frames7 frames, pitch up to 2,540 mm8 frames, pitch up to 2,190 mm8 frames, pitch up to 2,190 mm
Posts141616
Footings (bored concrete)14 pcs, Ø400 mm, depth 1,100 mm16 pcs, Ø300 mm, depth 1,100 mm16 pcs, Ø300 mm, depth 1,300 mm
Concrete2.13 m³1.37 m³1.62 m³
Tilt30°30°30°
Panel bottom / post top600 / 1,913 mm600 / 1,913 mm600 / 1,913 mm
Panel field size16,020 × 2,455 mm16,020 × 2,455 mm16,020 × 2,455 mm
Row spacing between tables (no shade on 21 December)8,420 mm at noon · 9,460 mm ±2 h9,320 mm at noon · 10,770 mm ±2 h10,220 mm at noon · 12,150 mm ±2 h
Steel410.8 kg438.2 kg449.7 kg
BoltsM10 — 112, M8 — 64M10 — 122, M8 — 64M10 — 122, M8 — 64
Panel clampsend 8, middle 56end 8, middle 56end 8, middle 56
Materials57,874 UAH58,393 UAH59,679 UAH
With installation and delivery90,484 UAH90,953 UAH92,239 UAH
Per 1 kW7,181 UAH/kW7,218 UAH/kW7,321 UAH/kW
Yield1,266 kWh/kW · 15,957 kWh/year1,139 kWh/kW · 14,349 kWh/year1,043 kWh/kW · 13,143 kWh/year
Strength σ/fy81%83%89%
Deflection / (L/200)81%71%77%
Rafter strength74%88%94%
Post utilisation15%18%19%
Utilisation93%99%81%
Depth vs frost depthokokok
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Kherson: Frame spacing 2 540 mm, 7 frames. Purlin C-channel 60×40×2: strength 81%, deflection 81% of L/200 (snow on panel 489 Pa).Cherkasy: Frame spacing 2 190 mm, 8 frames. Purlin C-channel 60×40×2: strength 83%, deflection 71% of L/200 (snow on panel 977 Pa).Chernihiv: Frame spacing 2 190 mm, 8 frames. Purlin C-channel 60×40×2: strength 89%, deflection 77% of L/200 (snow on panel 1 106 Pa).
  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø400 × 1 100: 0.138 m³ of concrete per post. Wind uplift on the front post ≈ 12.4 kN (with γ=1.5) vs ≈ 13.4 kN (concrete weight + soil friction, estimate) → 93%.Cherkasy: Foundation Ø300 × 1 100: 0.078 m³ of concrete per post. Wind uplift on the front post ≈ 9.3 kN (with γ=1.5) vs ≈ 9.5 kN (concrete weight + soil friction, estimate) → 99%.Chernihiv: Foundation Ø300 × 1 300: 0.092 m³ of concrete per post. Wind uplift on the front post ≈ 9.1 kN (with γ=1.5) vs ≈ 11.2 kN (concrete weight + soil friction, estimate) → 81%.
  • Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Cherkasy: Rafter C-channel 60×40×2: span between posts 1 815, cantilever 657 mm → strength 88%.Chernihiv: Rafter C-channel 60×40×2: span between posts 1 815, cantilever 657 mm → strength 94%.

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,1318
П2Rear postTube 60×60×23,0388
Кр1Rafter (inclined beam)C-channel 60×40×23,1308
Пк1Frame strutC-channel 60×40×21,4938
Х1Longitudinal brace (cross)C-channel 60×40×22,5544
Р1Purlin (rail)C-channel 60×40×26,0002
Р2Purlin (rail)C-channel 60×40×26,0002
Р3Purlin (rail)C-channel 60×40×26,0002
Р4Purlin (rail)C-channel 60×40×26,0002
Р5Purlin (rail)C-channel 60×40×24,0202
Р6Purlin (rail)C-channel 60×40×24,0202
—Bolt M10×25 set · purlins, braces, connectors——34
—Bolt M10×80 set · purlin to rafter——32
—Bolt M10×90 set · strut to post — through spacer inserts——8
—Bolt M10×130 set · post–rafter — through spacer inserts——32
—Bolt M10×140 set · strut to rafter — through spacer inserts——8
—Bolt M10×150 set · brace to post — through spacer inserts——8
—End clamp 30 mm——8
—Mid clamp (30–40 mm)——56
—Bolt M8×50 + channel nut——64
—Concrete for 16 posts, Ø300×1100——1.37 m³

Profile cutting

28 bars of 6,000 mm, 152.6 m of profile in total.

  • Tube 60×60×28 bars
  • C-channel 60×40×220 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
58,393₴
With installation and delivery
90,953₴
Per 1 kW
7,218UAH/kW

The engine's estimate has 23 lines; the full list is in the builder. Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 14,349 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.