Section of the table from the Solispec engine (median zone — Cherkasy)

REC

Ground frame for 24 REC Alpha Pure 2 REC420AA Pure 2 (HJT) panels (2×12)

2 rows of 12 panels, 10.08 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
10.08kW
Steel
373.1kg
Posts
14
Bolts
164
Materials
50,592₴
Yield
11,479kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the REC Alpha Pure 2 REC420AA Pure 2 (HJT) panel and the 2 × 12 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersTube 60×60×2C-channel 60×40×2C-channel 60×40×2
Purlins and bracesC-channel 41×41×2.5C-channel 60×40×2C-channel 60×40×2
Frames7 frames, pitch up to 2,040 mm7 frames, pitch up to 2,040 mm7 frames, pitch up to 2,040 mm
Posts141414
Footings (bored concrete)14 pcs, Ø400 mm, depth 900 mm14 pcs, Ø300 mm, depth 1,100 mm14 pcs, Ø300 mm, depth 1,300 mm
Concrete1.74 m³1.20 m³1.42 m³
Tilt30°30°30°
Panel bottom / post top600 / 1,930 mm600 / 1,913 mm600 / 1,913 mm
Panel field size12,840 × 2,445 mm12,840 × 2,455 mm12,840 × 2,455 mm
Row spacing between tables (no shade on 21 December)8,420 mm at noon · 9,460 mm ±2 h9,320 mm at noon · 10,770 mm ±2 h10,220 mm at noon · 12,150 mm ±2 h
Steel386.1 kg373.1 kg383.2 kg
BoltsM10 — 112, M8 — 52M10 — 112, M8 — 52M10 — 112, M8 — 52
Panel clampsend 8, middle 44end 8, middle 44end 8, middle 44
Materials48,013 UAH50,592 UAH51,736 UAH
With installation and delivery74,638 UAH76,902 UAH78,046 UAH
Per 1 kW7,405 UAH/kW7,629 UAH/kW7,743 UAH/kW
Yield1,266 kWh/kW · 12,766 kWh/year1,139 kWh/kW · 11,479 kWh/year1,043 kWh/kW · 10,515 kWh/year
Strength σ/fy94%72%77%
Deflection / (L/200)95%58%62%
Rafter strength39%82%88%
Post utilisation12%16%18%
Utilisation91%92%76%
Depth vs frost depthokokok
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Kherson: Frame spacing 2 040 mm, 7 frames. Purlin C-channel 41×41×2.5: strength 94%, deflection 95% of L/200 (snow on panel 489 Pa).
  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø400 × 900: 0.113 m³ of concrete per post. Wind uplift on the front post ≈ 9.9 kN (with γ=1.5) vs ≈ 10.9 kN (concrete weight + soil friction, estimate) → 91%.Cherkasy: Foundation Ø300 × 1 100: 0.078 m³ of concrete per post. Wind uplift on the front post ≈ 8.7 kN (with γ=1.5) vs ≈ 9.5 kN (concrete weight + soil friction, estimate) → 92%.
  • Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Cherkasy: Rafter C-channel 60×40×2: span between posts 1 815, cantilever 657 mm → strength 82%.Chernihiv: Rafter C-channel 60×40×2: span between posts 1 815, cantilever 657 mm → strength 88%.

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,1317
П2Rear postTube 60×60×23,0387
Кр1Rafter (inclined beam)C-channel 60×40×23,1307
Пк1Frame strutC-channel 60×40×21,4937
Х1Longitudinal brace (cross)C-channel 60×40×22,4244
Р1Purlin (rail)C-channel 60×40×26,0002
Р2Purlin (rail)C-channel 60×40×26,0002
Р3Purlin (rail)C-channel 60×40×26,0002
Р4Purlin (rail)C-channel 60×40×26,0002
Р5Purlin (rail)C-channel 60×40×28402
Р6Purlin (rail)C-channel 60×40×28402
—Bolt M10×25 set · purlins, braces, connectors——34
—Bolt M10×80 set · purlin to rafter——28
—Bolt M10×90 set · strut to post — through spacer inserts——7
—Bolt M10×120 set · post–rafter——28
—Bolt M10×130 set · strut to rafter — through spacer inserts——7
—Bolt M10×150 set · brace to post — through spacer inserts——8
—End clamp 30 mm——8
—Mid clamp (30–40 mm)——44
—Bolt M8×50 + channel nut——52
—Concrete for 14 posts, Ø300×1100——1.20 m³

Profile cutting

24 bars of 6,000 mm, 129.6 m of profile in total.

  • Tube 60×60×27 bars
  • C-channel 60×40×217 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
50,592₴
With installation and delivery
76,902₴
Per 1 kW
7,629UAH/kW

Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

All 23 lines of the engine's estimate, with prices
ItemQuantityPrice, UAHSum, UAH
Tube 60×60×2, stock length 6 000 mm7 bar2108,820
C-channel 60×40×2, stock length 6 000 mm17 bar23023,460
C-channel connector (splice plate L 300)8 pcs90720
Bolt M10×25 cl. 8.8 set — purlins, braces, connectors46 pcs221,012
Bolt M10×80 cl. 8.8 set — purlin to rafter28 pcs27756
Bolt M10×90 cl. 8.8 set — strut to post — through spacer inserts7 pcs27189
Bolt M10×120 cl. 8.8 set — post–rafter28 pcs27756
Bolt M10×130 cl. 8.8 set — strut to rafter — through spacer inserts7 pcs27189
Bolt M10×150 cl. 8.8 set — brace to post — through spacer inserts8 pcs27216
End clamp 30 mm8 pcs35280
Mid clamp (30–40 mm)44 pcs321,408
Bolt M8×50 A2 + spring channel nut M858 pcs14812
Post base anchor pin (M10 / rebar Ø12)14 pcs20280
Borehole casing (roofing felt / PVC, 300 mm)14 pcs60840
Crushed stone 20–40 for the bottom of the boreholes0.10 m³90090
Earth electrode: 2 rods Ø16×1.5 m + strip 40×41 set1,5001,500
Wire PV-3 6 mm² green-yellow32 m351,120
Module earthing clip (under the clamp)24 pcs20480
Cable clip, stainless72 pcs5360
Zinc paint / cold galvanising spray 400 ml2 pcs350700
Concrete M200 for posts1.20 m³3,8004,560
Rebar Ø10 (4 bars per post)73 m282,044
Spacer inserts / packs — pieces of the same profile (from offcuts): 4 × 71 mm, 7 × 70 mm, 4 × 30 mm, 7 × 10 mm22 pcs00
Materials50,592

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 11,479 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.