Tilting a 12-panel ground-mount table (6.60 kWp) in Warsaw to 50° instead of 35° yields 979 kWh from November to February instead of 888 (+10 %) and costs only 1.3 % over the year. At 70° the winter gain rises to +14 %, but the year drops by 11 %, the rear post becomes slender (λ = 174 against a limit of 150) and the frame narrows to 770 mm between its posts. The calculation is preliminary.
Every autumn someone asks whether the panels should go steeper for winter, especially when the system feeds a battery. The answer depends on two things: how much energy you actually gain in December and January, and what happens to a structure that gets taller and narrower. Below, one and the same structure is calculated by the Solispec engine at three tilts in two cities, Warsaw and Kyiv. Yield comes from PVGIS, exactly as the payback calculator takes it.
The structure
- Table: 12 panels, 2350 x 1100 mm, 550 W each (6.60 kWp), 2 rows of 6 in portrait, lower edge 800 mm above ground.
- 5 frames at 1590 mm, 10 posts. Purlins: C 60 x 40 x 2. Crossbeam: C 100 x 50 x 2.5. Posts: 60 x 60 x 2 tube.
- Foundation under each post: a Ø350 mm concrete footing 1300 mm deep, 1.38 m³ of concrete per table at every tilt.
- Warsaw: s_k = 900 Pa, q_b = 300 Pa per EN 1991-1-3 and EN 1991-1-4 with the Polish national annex, 113 m above sea level, terrain category II.
- Kyiv: snow S0 = 1550 Pa, wind W0 = 370 Pa per the Ukrainian load standard DBN V.1.2-2:2006.
Only the tilt changes: 35° (the engine puts the yearly optimum for both cities at 36°), 50° and 70°.
Yield: what winter gives and summer takes
PVGIS 5.3 data (SARAH3 database, 2014 to 2023), typical year, 14 % losses, panels facing south.
| Warsaw, 6.60 kWp | 35° | 50° | 70° |
|---|---|---|---|
| December, kWh | 154 | 175 | 185 |
| January, kWh | 198 | 222 | 232 |
| November to February, kWh | 888 | 979 | 1010 |
| April to September, kWh | 4961 | 4739 | 4077 |
| Year, kWh | 6865 | 6778 | 6112 |
| Kyiv, 6.60 kWp | 35° | 50° | 70° |
|---|---|---|---|
| December, kWh | 174 | 195 | 204 |
| January, kWh | 222 | 246 | 254 |
| November to February, kWh | 971 | 1058 | 1080 |
| April to September, kWh | 5174 | 4927 | 4209 |
| Year, kWh | 7324 | 7212 | 6477 |
What this means:
- 50° instead of 35°. Warsaw: winter +91 kWh (+10 %), year −87 kWh (−1.3 %). Kyiv: winter +87 kWh (+9 %), year −112 kWh (−1.5 %). Summer (April to September) loses 222 kWh in Warsaw, and winter, March and October win most of that back.
- 70° instead of 35°. Warsaw: winter +122 kWh (+14 %), year −753 kWh (−11 %). Kyiv: winter +109 kWh (+11 %), year −847 kWh (−11.6 %). Going from 50° to 70° adds only 22 to 31 kWh in winter, while summer loses more than 600 kWh.
The designer's quick formula (without PVGIS) gives a year of 6711, 6486 and 5340 kWh for Warsaw and 7241, 6973 and 5704 kWh for Kyiv. At 70° it is more pessimistic than PVGIS, so base this decision on PVGIS. The payback calculator or the system size calculator shows the month-by-month yield for your own tilt.
PVGIS does not model snow lying on the panels. The engine assumes, per EN 1991-1-3, that snow does not stay on a slope from 60° up. A steep table may therefore lose less in snowy weeks than one at 35°, but neither model calculates that difference.
Structure: Warsaw per EN 1991 with the national annex
| Warsaw | 35° | 50° | 70° |
|---|---|---|---|
| Snow shape coefficient μ | 0.67 | 0.27 | 0 |
| Snow Sm on plan, Pa | 900 | 360 | 0 |
| Wind Wm at table height, Pa | 779 | 837 | 881 |
| Canopy c_f, uplift / pressure | 2.00 / 1.35 | 2.40 / 1.70 | 2.60 / 1.90 |
| Top of table, mm | 3536 | 4438 | 5247 |
| Front to rear post, mm | 1843 | 1447 | 770 |
| Purlin C 60 x 40 x 2, strength | 45 % | 49 % | 54 % |
| Crossbeam C 100 x 50 x 2.5, strength | 22 % | 24 % | 27 % |
| Rear post, height, mm | 2709 | 3399 | 4037 |
| Rear post, slenderness λ (limit 150) | 117 | 147 | 174 |
| Rear post, utilisation | 15 % | 24 % | 35 % |
| Uplift on the front post, kN | 7.18 | 7.27 | 4.41 |
| Foundation, utilisation | 54 % | 54 % | 33 % |
| 6 m stock lengths | 22 | 24 | 26 |
Structure: Kyiv per DBN V.1.2-2:2006
| Kyiv | 35° | 50° | 70° |
|---|---|---|---|
| Snow coefficient μ | 0.71 | 0.29 | 0 |
| Snow Sm on plan, Pa | 1107 | 443 | 0 |
| Wind Wm at table height, Pa | 640 | 688 | 724 |
| Purlin C 60 x 40 x 2, strength | 49 % | 43 % | 44 % |
| Crossbeam C 100 x 50 x 2.5, strength | 24 % | 21 % | 22 % |
| Rear post, slenderness λ (limit 150) | 117 | 147 | 174 |
| Rear post, utilisation | 17 % | 21 % | 28 % |
| Uplift on the front post, kN | 5.91 | 5.98 | 3.63 |
| Foundation, utilisation | 44 % | 45 % | 27 % |
Geometry, top height and stock lengths are the same as in Warsaw. Do not compare the two cities' Wm directly: under EN the wind is multiplied by γQ = 1.5, while the Ukrainian factor for a 50-year return period is 1.0.
What happens to the structure
Snow goes, wind grows. The steeper the table, the less snow stays on it: in Warsaw the design snow falls from 900 Pa to 360 Pa at 50° and to zero at 70°. At the same time the top edge rises from 3.5 m to 5.2 m, and the wind is stronger up there: Wm grows from 779 to 881 Pa. On top of that, the canopy force coefficient c_f in EN 1991-1-4 (Table 7.6) is only given up to 30°. For 35°, 50° and 70° the engine extrapolates it and flags this with a warning. That is the first thing a structural engineer should check.
Purlin and crossbeam barely change. In Warsaw, with less snow, wind pressure governs the purlin and it climbs from 45 % to 54 % at 70°. In Kyiv, where snow governs, it is most loaded at 35° (49 %). It never comes near the limit.
Uplift per post is lower at 70°. The engine checks the vertical part of the wind force, Fz = c_f · Wm · A · cos α. At 70° the cosine is small, so uplift on the front post falls to 4.41 kN in Warsaw. The force does not vanish, though: it turns horizontal and pushes the table, and at 70° the frame has only 770 mm between its posts. The engine does not print the horizontal force or the overturning of the frame separately in this mode, which is the second thing the engineer checks.
The rear post gets slender. At 70° the rear post is 4037 mm long, its slenderness λ = 174 exceeds 150, and the engine issues a warning. At 50° (λ = 147) it is still within the limit. For a tall post the engine requires bracing in both planes. It places braces between the rear posts at every tilt (4 pieces of 2562, 3133 and 3697 mm respectively).
The foundation stays the same. 1.38 m³ of concrete per table at every tilt, with uplift utilisation between 27 % and 54 %. The 1300 mm embedment is below the frost depth (1000 mm in Warsaw, 1100 mm in Kyiv per the engine's data).
Row spacing
If a second table stands behind the first, a steeper table casts a longer shadow. Per the tilt and row spacing calculator (21 December, no shade from 10:00 to 14:00), the row pitch for this table is:
| Row pitch, mm | 35° | 50° | 70° |
|---|---|---|---|
| Warsaw | 17 570 | 21 340 | 24 070 |
| Kyiv | 15 640 | 18 760 | 20 900 |
For a single table this does not matter. On a field with several rows, 70° takes about a third more land than 35°.
What to choose
- 35° to 36° gives the most energy over the year. If you export the surplus, this is the default.
- 50° is a sensible compromise for a battery system that has to carry the winter: winter +9 % to +10 %, year only −1.3 % to −1.5 %, practically the same steel and concrete, rear post still within the slenderness limit.
- 70° adds almost no winter energy over 50°, loses 11 % to 12 % of the year, lifts the table above 5 m and calls for attention to post slenderness and horizontal wind force.
You can check your own table in the Solispec designer; the ground layout is described under ground mounting. How the engine calculates a similar table, and where it is more cautious than a hand calculation, is shown in the article on the 10 kWp ground mount near Lublin. Snow and wind for your address come from the snow and wind calculator.
This is a preliminary calculation. A qualified structural engineer checks the structure before installation, in particular the wind force coefficient above 30°, the horizontal force and the ground. PVGIS yield is a typical-year model, not a promise of output.
FAQ
What is the best solar panel tilt for winter in Warsaw?
For 6.60 kWp in Warsaw, November to February gives 888 kWh at 35°, 979 kWh at 50° and 1010 kWh at 70° (PVGIS). The best compromise is 50°: +10 % in winter for only −1.3 % over the year. 70° lifts the winter gain to +14 % but loses 11 % of the year.
How much does a system lose per year at a 70° tilt?
In Warsaw 6.60 kWp makes 6865 kWh a year at 35° and 6112 kWh at 70°, which is −753 kWh (−11 %). In Kyiv it is 7324 against 6477 kWh (−11.6 %).
Is the structure heavier at 70°?
Slightly more steel (26 stock lengths of 6 m instead of 22), the same concrete (1.38 m³). Purlin and crossbeam work at 22 % to 54 %. But the rear post at 70° is slender (λ = 174 against 150), the frame narrows to 770 mm between posts, and the engine only extrapolates the wind force coefficient above 30°. A structural engineer checks these points.
Why is the uplift per post lower at 70° than at 35°?
The engine checks the vertical part of the wind force, which is multiplied by cos α. At 70° it is smaller (4.41 kN against 7.18 kN in Warsaw), but the horizontal part that pushes and overturns the table is larger. It is not given separately in this report, so the engineer checks it.
Does PVGIS account for snow on the panels?
No. PVGIS calculates a typical year without snow cover on the modules. The engine assumes snow does not stay on a slope from 60° up, so a steep table may lose less in snowy weeks, but neither model calculates that difference.