Solar plant: site data
Solar power plant in Novopetrivka, Berdianskyi Raion, Zaporizhzhia Oblast
Novopetrivka: 1,272 kWh per kWp a year, tilt 35° 4° west of south (PVGIS). 4.9% above the oblast median (1,212). #23 of 116 in the rayon, #50 of 972 in the oblast.
Berdyansk, the rayon centre, is 11 km away. 5 m above sea level. 11 km away: Berdyansk, the nearest bigger centre, 1,294 — 1.8% less here. Snow and wind from the nearest regional centre in the DBN — Запоріжжя, 175 km. 9.22 m between rows, pitch 13.14 m (latitude 46.8°).
- Yield of 1 kWp
- 1,272kWh/year
- Tilt
- 35°4° west of south
- 10 kW
- 12,715kWh/year
- Row pitch
- 13.14m · GCR 0.36
- T_min
- -42 °Cregion II, south-eastern
- Snow S₀ / wind W₀
- 1,110 / 460Pa
Ground frame designer
A ground frame for a solar plant: Novopetrivka
The designer opens with this place’s coordinates, latitude 46.8° for the row spacing and the DBN loads of the nearest regional centre — Запоріжжя, 175 km: snow 1,110 Pa, wind 460 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
August: 162 kWh/kWp, December: 37 — 4.4 times less.
December: 37 against 32 in the oblast, 15.6% more.
| kWp | A year | August | December |
|---|---|---|---|
| 5 | 6,358 | 810 | 185 |
| 10 | 12,715 | 1,620 | 370 |
| 15 | 19,073 | 2,430 | 555 |
Example: a 10 kW ground frame
For the loads of Zaporizhzhia: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.
How these numbers are computed
Nearby
- Staropetrivka4 km1,297 kWh/kWp
- Novovasylivka9 km1,304 kWh/kWp
- Osypenko11 km1,266 kWh/kWp
- Berdyansk11 km1,294 kWh/kWp
- Kulykivske13 km1,260 kWh/kWp
- Shovkove16 km1,291 kWh/kWp
All places: Berdianskyi RaionZaporizhzhia Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.