Solar plant: site data

Solar power plant in Berdyansk, Berdianskyi Raion, Zaporizhzhia Oblast

Berdyansk: 1,294 kWh per kWp a year, tilt 36° 4° west of south (PVGIS). 6.8% above the oblast median (1,212). #5 of 116 in the rayon, #8 of 972 in the oblast.

Berdyansk is the rayon centre. 10 m above sea level. 69 km away: Mariupol, the nearest bigger centre, 1,245 — 4.0% more here. Snow and wind from the nearest regional centre in the DBN — Запоріжжя, 174 km. 9.41 m between rows, pitch 13.28 m (latitude 46.8°).

Yield of 1 kWp
1,294kWh/year
Tilt
36°4° west of south
10 kW
12,944kWh/year
Row pitch
13.28m · GCR 0.36
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,110 / 460Pa

Ground frame designer

A ground frame for a solar plant: Berdyansk

The designer opens with this place’s coordinates, latitude 46.8° for the row spacing and the DBN loads of the nearest regional centre — Запоріжжя, 174 km: snow 1,110 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

45Jan64Feb104Mar131Apr153May154Jun160Jul162Aug132Sep97Oct54Nov37Dec

August: 162 kWh/kWp, December: 37 — 4.4 times less.

January: 45 against 37 in the oblast, 21.6% more.

Berdyansk: plants, kWh
kWpA yearAugustDecember
56,472810185
1012,9441,620370
1519,4162,430555

Snow and wind: Запоріжжя

Example: a 10 kW ground frame

For the loads of Zaporizhzhia: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Berdianskyi RaionZaporizhzhia Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.