Solar power plant in Berdyanska Kosa, Berdianskyi Raion, Zaporizhzhia Oblast
Berdyanska Kosa: 1,266 kWh per kWp a year, tilt 35° 5° west of south (PVGIS). 4.4% above the oblast median (1,212). #27 of 116 in the rayon, #66 of 972 in the oblast.
Berdyansk, the rayon centre, is 10 km away. 1 m above sea level. 10 km away: Berdyansk, the nearest bigger centre, 1,294 — 2.2% less here. Snow and wind from the nearest regional centre in the DBN — Запоріжжя, 182 km. 9.13 m between rows, pitch 13.05 m (latitude 46.7°).
- Yield of 1 kWp
- 1,266kWh/year
- Tilt
- 35°5° west of south
- 10 kW
- 12,655kWh/year
- Row pitch
- 13.05m · GCR 0.37
- T_min
- -42 °Cregion II, south-eastern
- Snow S₀ / wind W₀
- 1,110 / 460Pa
Ground frame designer
A ground frame for a solar plant: Berdyanska Kosa
The designer opens with this place’s coordinates, latitude 46.7° for the row spacing and the DBN loads of the nearest regional centre — Запоріжжя, 182 km: snow 1,110 Pa, wind 460 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 161 kWh/kWp, December: 35 — 4.6 times less.
January: 41 against 37 in the oblast, 10.8% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 6,328 | 805 | 175 |
| 10 | 12,655 | 1,610 | 350 |
| 15 | 18,983 | 2,415 | 525 |
Example: a 10 kW ground frame
For the loads of Zaporizhzhia: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.
How these numbers are computed
Nearby
- Berdyansk10 km1,294 kWh/kWp
- Azovs'ke18 km1,281 kWh/kWp
- Novopetrivka19 km1,272 kWh/kWp
- Staropetrivka20 km1,297 kWh/kWp
- Novovasylivka20 km1,304 kWh/kWp
- Shovkove22 km1,291 kWh/kWp
All places: Berdianskyi RaionZaporizhzhia Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.