Solar plant: site data

Solar power plant in Kulykivske, Berdianskyi Raion, Zaporizhzhia Oblast

Kulykivske: 1,260 kWh per kWp a year, tilt 36° 4° west of south (PVGIS). 4.0% above the oblast median (1,212). #29 of 116 in the rayon, #71 of 972 in the oblast.

Berdyansk, the rayon centre, is 24 km away. 31 m above sea level. 24 km away: Berdyansk, the nearest bigger centre, 1,294 — 2.6% less here. Snow and wind from the nearest regional centre in the DBN — Запоріжжя, 180 km. 9.48 m between rows, pitch 13.35 m (latitude 46.9°).

Yield of 1 kWp
1,260kWh/year
Tilt
36°4° west of south
10 kW
12,602kWh/year
Row pitch
13.35m · GCR 0.36
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,110 / 460Pa

Ground frame designer

A ground frame for a solar plant: Kulykivske

The designer opens with this place’s coordinates, latitude 46.9° for the row spacing and the DBN loads of the nearest regional centre — Запоріжжя, 180 km: snow 1,110 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

42Jan59Feb102Mar127Apr148May150Jun157Jul161Aug131Sep95Oct51Nov36Dec

August: 161 kWh/kWp, December: 36 — 4.5 times less.

January: 42 against 37 in the oblast, 13.5% more.

Kulykivske: plants, kWh
kWpA yearAugustDecember
56,301805180
1012,6021,610360
1518,9032,415540

Snow and wind: Запоріжжя

Example: a 10 kW ground frame

For the loads of Zaporizhzhia: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Berdianskyi RaionZaporizhzhia Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.