Solar plant: site data
Solar power plant in Zavyika, Khustskyi Raion, Zakarpattia Oblast
Zavyika: 1,005 kWh per kWp a year, tilt 36° 3° west of south (PVGIS). 11.9% below the oblast median (1,141). #129 of 145 in the rayon, #583 of 613 in the oblast.
Khust, the rayon centre, is 63 km away. 854 m above sea level — above 500 m the DBN snow and wind are higher. 63 km away: Khust, the nearest bigger centre, 978 — 2.7% more here. Snow and wind from the nearest regional centre in the DBN — Івано-Франківськ, 88 km. 10.73 m between rows, pitch 14.60 m (latitude 48.7°).
- Yield of 1 kWp
- 1,005kWh/year
- Tilt
- 36°3° west of south
- 10 kW
- 10,048kWh/year
- Row pitch
- 14.60m · GCR 0.33
- T_min
- -38 °Cregion IIIA, Carpathian
- Snow S₀ / wind W₀
- 1,410 / 500Pa
Ground frame designer
A ground frame for a solar plant: Zavyika
The designer opens with this place’s coordinates, latitude 48.7° for the row spacing and the DBN loads of the nearest regional centre — Івано-Франківськ, 88 km: snow 1,410 Pa, wind 500 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
August: 125 kWh/kWp, December: 28 — 4.5 times less.
November: 45 against 53 in the oblast, 15.1% less.
| kWp | A year | August | December |
|---|---|---|---|
| 5 | 5,024 | 625 | 140 |
| 10 | 10,048 | 1,250 | 280 |
| 15 | 15,072 | 1,875 | 420 |
Snow and wind: Івано-Франківськ
Example: a 10 kW ground frame
For the loads of Ivano-Frankivsk: 11.16 kWp, 18 panels, 410 kg of steel, 16 piles, materials ≈ 54,212 UAH.
How these numbers are computed
Nearby
- Pryslip3 km1,008 kWh/kWp
- Titkivtsi4 km949 kWh/kWp
- Torun6 km950 kWh/kWp
- Senechiv6 km1,015 kWh/kWp
- Novoselytsia6 km1,028 kWh/kWp
- Lopushne7 km1,017 kWh/kWp
All places: Khustskyi RaionZakarpattia Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.