Solar plant: site data

Solar power plant in Novoselytsia, Khustskyi Raion, Zakarpattia Oblast

Novoselytsia: 1,028 kWh per kWp a year, tilt 37° 8° east of south (PVGIS). 9.9% below the oblast median (1,141). #119 of 145 in the rayon, #566 of 613 in the oblast.

Khust, the rayon centre, is 60 km away. 660 m above sea level — above 500 m the DBN snow and wind are higher. 60 km away: Khust, the nearest bigger centre, 978 — 5.1% more here. Snow and wind from the nearest regional centre in the DBN — Ужгород, 87 km. 10.97 m between rows, pitch 14.79 m (latitude 48.7°).

Yield of 1 kWp
1,028kWh/year
Tilt
37°8° east of south
10 kW
10,280kWh/year
Row pitch
14.79m · GCR 0.32
T_min
-38 °Cregion IIIA, Carpathian
Snow S₀ / wind W₀
1,340 / 370Pa

Ground frame designer

A ground frame for a solar plant: Novoselytsia

The designer opens with this place’s coordinates, latitude 48.7° for the row spacing and the DBN loads of the nearest regional centre — Ужгород, 87 km: snow 1,340 Pa, wind 370 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

45Jan60Feb90Mar105Apr110May114Jun122Jul124Aug100Sep80Oct49Nov30Dec

August: 124 kWh/kWp, December: 30 — 4.1 times less.

January: 45 against 39 in the oblast, 15.4% more.

Novoselytsia: plants, kWh
kWpA yearAugustDecember
55,140620150
1010,2801,240300
1515,4201,860450

Snow and wind: Ужгород

Example: a 10 kW ground frame

For the loads of Uzhhorod: 11.16 kWp, 18 panels, 366 kg of steel, 12 piles, materials ≈ 48,597 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Khustskyi RaionZakarpattia Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.