Solar plant: site data

Solar power plant in Vovchyi, Mukachivskyi Raion, Zakarpattia Oblast

Vovchyi: 1,042 kWh per kWp a year, tilt 35° 12° east of south (PVGIS). 8.7% below the oblast median (1,141). #132 of 139 in the rayon, #538 of 613 in the oblast.

Mukachevo, the rayon centre, is 32 km away. 328 m above sea level. 32 km away: Mukachevo, the nearest bigger centre, 1,165 — 10.6% less here. Snow and wind from the nearest regional centre in the DBN — Ужгород, 57 km. 10.38 m between rows, pitch 14.30 m (latitude 48.6°).

Yield of 1 kWp
1,042kWh/year
Tilt
35°12° east of south
10 kW
10,416kWh/year
Row pitch
14.30m · GCR 0.33
T_min
-38 °Cregion IIIA, Carpathian
Snow S₀ / wind W₀
1,340 / 370Pa

Ground frame designer

A ground frame for a solar plant: Vovchyi

The designer opens with this place’s coordinates, latitude 48.6° for the row spacing and the DBN loads of the nearest regional centre — Ужгород, 57 km: snow 1,340 Pa, wind 370 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

34Jan51Feb88Mar108Apr124May130Jun135Jul132Aug103Sep72Oct41Nov23Dec

July: 135 kWh/kWp, December: 23 — 5.9 times less.

December: 23 against 31 in the oblast, 25.8% less.

Vovchyi: plants, kWh
kWpA yearJulyDecember
55,208675115
1010,4161,350230
1515,6242,025345

Snow and wind: Ужгород

Example: a 10 kW ground frame

For the loads of Uzhhorod: 11.16 kWp, 18 panels, 366 kg of steel, 12 piles, materials ≈ 48,597 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Mukachivskyi RaionZakarpattia Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.