Solar plant: site data

Solar power plant in Mala Martynka, Mukachivskyi Raion, Zakarpattia Oblast

Mala Martynka: 1,104 kWh per kWp a year, tilt 37° 9° east of south (PVGIS). 3.3% below the oblast median (1,141). #99 of 139 in the rayon, #431 of 613 in the oblast.

Mukachevo, the rayon centre, is 28 km away. 269 m above sea level. 28 km away: Mukachevo, the nearest bigger centre, 1,165 — 5.3% less here. Snow and wind from the nearest regional centre in the DBN — Ужгород, 58 km. 10.84 m between rows, pitch 14.66 m (latitude 48.5°).

Yield of 1 kWp
1,104kWh/year
Tilt
37°9° east of south
10 kW
11,039kWh/year
Row pitch
14.66m · GCR 0.33
T_min
-32 °Cregion IIIB, Transcarpathian
Snow S₀ / wind W₀
1,340 / 370Pa

Ground frame designer

A ground frame for a solar plant: Mala Martynka

The designer opens with this place’s coordinates, latitude 48.5° for the row spacing and the DBN loads of the nearest regional centre — Ужгород, 58 km: snow 1,340 Pa, wind 370 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

42Jan60Feb96Mar112Apr123May129Jun135Jul135Aug108Sep83Oct51Nov30Dec

July: 135 kWh/kWp, December: 30 — 4.5 times less.

January: 42 against 39 in the oblast, 7.7% more.

Mala Martynka: plants, kWh
kWpA yearJulyDecember
55,520675150
1011,0391,350300
1516,5592,025450

Snow and wind: Ужгород

Example: a 10 kW ground frame

For the loads of Uzhhorod: 11.16 kWp, 18 panels, 366 kg of steel, 12 piles, materials ≈ 48,597 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Mukachivskyi RaionZakarpattia Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.