Solar plant: site data
Solar power plant in Nehrovets, Khustskyi Raion, Zakarpattia Oblast
Nehrovets: 985 kWh per kWp a year, tilt 31° facing south (PVGIS). 13.7% below the oblast median (1,141). #133 of 145 in the rayon, #592 of 613 in the oblast.
Khust, the rayon centre, is 41 km away. 589 m above sea level — above 500 m the DBN snow and wind are higher. 41 km away: Khust, the nearest bigger centre, 978 — 0.7% more here. Snow and wind from the nearest regional centre in the DBN — Івано-Франківськ, 94 km. 9.23 m between rows, pitch 13.33 m (latitude 48.5°).
- Yield of 1 kWp
- 985kWh/year
- Tilt
- 31°facing south
- 10 kW
- 9,848kWh/year
- Row pitch
- 13.33m · GCR 0.36
- T_min
- -38 °Cregion IIIA, Carpathian
- Snow S₀ / wind W₀
- 1,410 / 500Pa
Ground frame designer
A ground frame for a solar plant: Nehrovets
The designer opens with this place’s coordinates, latitude 48.5° for the row spacing and the DBN loads of the nearest regional centre — Івано-Франківськ, 94 km: snow 1,410 Pa, wind 500 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
August: 135 kWh/kWp, December: 10 — 13.5 times less.
December: 10 against 31 in the oblast, 67.7% less.
| kWp | A year | August | December |
|---|---|---|---|
| 5 | 4,924 | 675 | 50 |
| 10 | 9,848 | 1,350 | 100 |
| 15 | 14,772 | 2,025 | 150 |
Snow and wind: Івано-Франківськ
Example: a 10 kW ground frame
For the loads of Ivano-Frankivsk: 11.16 kWp, 18 panels, 410 kg of steel, 16 piles, materials ≈ 54,212 UAH.
How these numbers are computed
Nearby
- Kosiv Verkh3 km985 kWh/kWp
- Horb4 km1,032 kWh/kWp
- Kolochava5 km1,062 kWh/kWp
- Synevyr5 km1,081 kWh/kWp
- Zaverkhnia Kychera5 km925 kWh/kWp
- Bradulovets5 km1,069 kWh/kWp
All places: Khustskyi RaionZakarpattia Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.