Solar plant: site data
Solar power plant in Synevyr, Khustskyi Raion, Zakarpattia Oblast
Synevyr: 1,081 kWh per kWp a year, tilt 37° 13° east of south (PVGIS). 5.3% below the oblast median (1,141). #90 of 145 in the rayon, #475 of 613 in the oblast.
Khust, the rayon centre, is 43 km away. 662 m above sea level — above 500 m the DBN snow and wind are higher. 43 km away: Khust, the nearest bigger centre, 978 — 10.5% more here. Snow and wind from the nearest regional centre in the DBN — Івано-Франківськ, 93 km. 10.82 m between rows, pitch 14.64 m (latitude 48.5°).
- Yield of 1 kWp
- 1,081kWh/year
- Tilt
- 37°13° east of south
- 10 kW
- 10,811kWh/year
- Row pitch
- 14.64m · GCR 0.33
- T_min
- -38 °Cregion IIIA, Carpathian
- Snow S₀ / wind W₀
- 1,410 / 500Pa
Ground frame designer
A ground frame for a solar plant: Synevyr
The designer opens with this place’s coordinates, latitude 48.5° for the row spacing and the DBN loads of the nearest regional centre — Івано-Франківськ, 93 km: snow 1,410 Pa, wind 500 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
August: 134 kWh/kWp, December: 32 — 4.2 times less.
January: 43 against 39 in the oblast, 10.3% more.
| kWp | A year | August | December |
|---|---|---|---|
| 5 | 5,406 | 670 | 160 |
| 10 | 10,811 | 1,340 | 320 |
| 15 | 16,216 | 2,010 | 480 |
Snow and wind: Івано-Франківськ
Example: a 10 kW ground frame
For the loads of Ivano-Frankivsk: 11.16 kWp, 18 panels, 410 kg of steel, 16 piles, materials ≈ 54,212 UAH.
How these numbers are computed
Nearby
- Nehrovets5 km985 kWh/kWp
- Kosiv Verkh6 km985 kWh/kWp
- Zaverkhnia Kychera6 km925 kWh/kWp
- Vuchkove7 km884 kWh/kWp
- Horb8 km1,032 kWh/kWp
- Zaperedillia9 km1,046 kWh/kWp
All places: Khustskyi RaionZakarpattia Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.