Solar plant: site data
Solar power plant in Kolochava, Khustskyi Raion, Zakarpattia Oblast
Kolochava: 1,062 kWh per kWp a year, tilt 37° 5° east of south (PVGIS). 6.9% below the oblast median (1,141). #96 of 145 in the rayon, #504 of 613 in the oblast.
Khust, the rayon centre, is 41 km away. 551 m above sea level — above 500 m the DBN snow and wind are higher. 41 km away: Khust, the nearest bigger centre, 978 — 8.6% more here. Snow and wind from the nearest regional centre in the DBN — Івано-Франківськ, 93 km. 10.77 m between rows, pitch 14.59 m (latitude 48.4°).
- Yield of 1 kWp
- 1,062kWh/year
- Tilt
- 37°5° east of south
- 10 kW
- 10,621kWh/year
- Row pitch
- 14.59m · GCR 0.33
- T_min
- -38 °Cregion IIIA, Carpathian
- Snow S₀ / wind W₀
- 1,410 / 500Pa
Ground frame designer
A ground frame for a solar plant: Kolochava
The designer opens with this place’s coordinates, latitude 48.4° for the row spacing and the DBN loads of the nearest regional centre — Івано-Франківськ, 93 km: snow 1,410 Pa, wind 500 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
August: 130 kWh/kWp, December: 33 — 3.9 times less.
January: 46 against 39 in the oblast, 17.9% more.
| kWp | A year | August | December |
|---|---|---|---|
| 5 | 5,311 | 650 | 165 |
| 10 | 10,621 | 1,300 | 330 |
| 15 | 15,931 | 1,950 | 495 |
Snow and wind: Івано-Франківськ
Example: a 10 kW ground frame
For the loads of Ivano-Frankivsk: 11.16 kWp, 18 panels, 410 kg of steel, 16 piles, materials ≈ 54,212 UAH.
How these numbers are computed
Nearby
- Bradulovets2 km1,069 kWh/kWp
- Horb2 km1,032 kWh/kWp
- Mereshor4 km936 kWh/kWp
- Nehrovets5 km985 kWh/kWp
- Zaverkhnia Kychera6 km925 kWh/kWp
- Kosiv Verkh6 km985 kWh/kWp
All places: Khustskyi RaionZakarpattia Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.