Solar plant: site data

Solar power plant in Matiashivka, Myrhorodskyi Raion, Poltava Oblast

Matiashivka: 1,136 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). 0.5% below the oblast median (1,142). #148 of 430 in the rayon, #1248 of 1856 in the oblast.

Myrhorod, the rayon centre, is 23 km away. 89 m above sea level. 9 km away: Shyshaky, the nearest bigger centre, the same 1,133. Snow and wind from the nearest regional centre in the DBN — Полтава, 57 km. 11.96 m between rows, pitch 15.78 m (latitude 49.9°).

Yield of 1 kWp
1,136kWh/year
Tilt
37°2° east of south
10 kW
11,360kWh/year
Row pitch
15.78m · GCR 0.30
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,450 / 470Pa

Ground frame designer

A ground frame for a solar plant: Matiashivka

The designer opens with this place’s coordinates, latitude 49.9° for the row spacing and the DBN loads of the nearest regional centre — Полтава, 57 km: snow 1,450 Pa, wind 470 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

39Jan59Feb96Mar117Apr137May141Jun144Jul143Aug114Sep81Oct39Nov27Dec

July: 144 kWh/kWp, December: 27 — 5.3 times less.

January: 39 against 35 in the oblast, 11.4% more.

Matiashivka: plants, kWh
kWpA yearJulyDecember
55,680720135
1011,3601,440270
1517,0402,160405

Snow and wind: Полтава

Example: a 10 kW ground frame

For the loads of Poltava: 11.16 kWp, 18 panels, 389 kg of steel, 12 piles, materials ≈ 52,358 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed