Solar plant: site data

Solar power plant in Nyzhni Yaresky, Myrhorodskyi Raion, Poltava Oblast

Nyzhni Yaresky: 1,133 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). 0.8% below the oblast median (1,142). #210 of 430 in the rayon, #1388 of 1856 in the oblast.

Myrhorod, the rayon centre, is 26 km away. 112 m above sea level. 11 km away: Shyshaky, the nearest bigger centre, the same 1,133. Snow and wind from the nearest regional centre in the DBN — Полтава, 54 km. 11.92 m between rows, pitch 15.74 m (latitude 49.8°).

Yield of 1 kWp
1,133kWh/year
Tilt
37°2° east of south
10 kW
11,329kWh/year
Row pitch
15.74m · GCR 0.30
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,450 / 470Pa

Ground frame designer

A ground frame for a solar plant: Nyzhni Yaresky

The designer opens with this place’s coordinates, latitude 49.8° for the row spacing and the DBN loads of the nearest regional centre — Полтава, 54 km: snow 1,450 Pa, wind 470 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

37Jan57Feb95Mar117Apr138May141Jun144Jul144Aug115Sep82Oct39Nov25Dec

July: 144 kWh/kWp, December: 25 — 5.8 times less.

January: 37 against 35 in the oblast, 5.7% more.

Nyzhni Yaresky: plants, kWh
kWpA yearJulyDecember
55,665720125
1011,3291,440250
1516,9942,160375

Snow and wind: Полтава

Example: a 10 kW ground frame

For the loads of Poltava: 11.16 kWp, 18 panels, 389 kg of steel, 12 piles, materials ≈ 52,358 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Myrhorodskyi RaionPoltava Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.