Poland: solar plant site data

Solar power plant in Zamość, Poland: yield, tilt angle and row spacing

Zamość: 1,093 kWh per kWp a year at the optimal tilt of 38°, 2° east of south (PVGIS). 2.6% above the median of the main cities of Poland (1,065). #7 of 87 main cities of Poland by yield. For comparison, Kyiv: 1,114 kWh/kWp — 1.9% less here.

Zamość is in Lublin Voivodeship. Population 66,034 (GeoNames). 213 m above sea level. 76 km away: Lublin, the nearest bigger city, 1,080 kWh/kWp — 1.2% more here. 13.09 m between rows, pitch 16.86 m, GCR 0.28 (latitude 50.7°).

Yield of 1 kWp
1,093kWh/year
Tilt
38°2° east of south
10 kW
10,931kWh/year
Row pitch
16.86m · GCR 0.28
Rank in the country
7of 87 cities

Ground frame designer

A ground frame for a solar plant: Zamość

Latitude 50.7°: the tilt and the row pitch follow it. Enter the snow and wind for Poland in the designer, by the national annex to the Eurocode.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

33Jan55Feb95Mar119Apr130May134Jun134Jul131Aug107Sep84Oct41Nov29Dec

June: 134 kWh/kWp, December: 29 — 4.6 times less.

January: 33 against the median of 37 for the main cities of Poland, 10.8% less.

Zamość: plants, kWh
kWpA yearJuneDecember
55,466670145
1010,9311,340290
1516,3972,010435

Snow and wind loads

Snow and wind loads for a site in Poland follow PN-EN 1991-1-3 (snow) and PN-EN 1991-1-4 (wind) with the Polish National Annex (NA). Solispec computes loads by the Ukrainian DBN V.1.2-2 only, so this page shows no snow or wind values for Poland: enter the characteristic values from these documents in the designer’s «Own snow S0» and «Own wind W0» fields.

The frame calculation for such a site is preliminary: before installation it must be checked by an engineer who works to the country’s standards.