Solar plant: site data
Solar power plant in Spaske, Bilhorod-Dnistrovskyi Raion, Odesa Oblast
Spaske: 1,280 kWh per kWp a year, tilt 36° 3° east of south (PVGIS). 4.9% above the oblast median (1,221). #74 of 134 in the rayon, #171 of 1177 in the oblast.
Bilhorod-Dnistrovskyi, the rayon centre, is 85 km away. 32 m above sea level. 38 km away: Kiliya, the nearest bigger centre, 1,311 — 2.3% less here. Snow and wind from the nearest regional centre in the DBN — Одеса, 128 km. 8.85 m between rows, pitch 12.72 m (latitude 45.8°).
- Yield of 1 kWp
- 1,280kWh/year
- Tilt
- 36°3° east of south
- 10 kW
- 12,804kWh/year
- Row pitch
- 12.72m · GCR 0.38
- T_min
- -42 °Cregion II, south-eastern
- Snow S₀ / wind W₀
- 880 / 460Pa
Ground frame designer
A ground frame for a solar plant: Spaske
The designer opens with this place’s coordinates, latitude 45.8° for the row spacing and the DBN loads of the nearest regional centre — Одеса, 128 km: snow 880 Pa, wind 460 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
August: 151 kWh/kWp, January: 47 — 3.2 times less.
December: 49 against 38 in the oblast, 28.9% more.
| kWp | A year | August | January |
|---|---|---|---|
| 5 | 6,402 | 755 | 235 |
| 10 | 12,804 | 1,510 | 470 |
| 15 | 19,206 | 2,265 | 705 |
Example: a 10 kW ground frame
For the loads of Odesa: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.
How these numbers are computed
Nearby
- Bashtanivka3 km1,285 kWh/kWp
- Nadezhdivka4 km1,281 kWh/kWp
- Strumok4 km1,289 kWh/kWp
- Vynohradivka9 km1,272 kWh/kWp
- Delzhyler9 km1,279 kWh/kWp
- Nerushay12 km1,298 kWh/kWp
All places: Bilhorod-Dnistrovskyi RaionOdesa Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.