Solar plant: site data
Solar power plant in Nerushay, Bilhorod-Dnistrovskyi Raion, Odesa Oblast
Nerushay: 1,298 kWh per kWp a year, tilt 36° 1° east of south (PVGIS). 6.3% above the oblast median (1,221). #52 of 134 in the rayon, #85 of 1177 in the oblast.
Bilhorod-Dnistrovskyi, the rayon centre, is 88 km away. 12 m above sea level. 31 km away: Kiliya, the nearest bigger centre, 1,311 — 1.0% less here. Snow and wind from the nearest regional centre in the DBN — Одеса, 131 km. 8.79 m between rows, pitch 12.66 m (latitude 45.7°).
- Yield of 1 kWp
- 1,298kWh/year
- Tilt
- 36°1° east of south
- 10 kW
- 12,976kWh/year
- Row pitch
- 12.66m · GCR 0.38
- T_min
- -42 °Cregion II, south-eastern
- Snow S₀ / wind W₀
- 880 / 460Pa
Ground frame designer
A ground frame for a solar plant: Nerushay
The designer opens with this place’s coordinates, latitude 45.7° for the row spacing and the DBN loads of the nearest regional centre — Одеса, 131 km: snow 880 Pa, wind 460 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
August: 154 kWh/kWp, January: 49 — 3.1 times less.
December: 49 against 38 in the oblast, 28.9% more.
| kWp | A year | August | January |
|---|---|---|---|
| 5 | 6,488 | 770 | 245 |
| 10 | 12,976 | 1,540 | 490 |
| 15 | 19,464 | 2,310 | 735 |
Example: a 10 kW ground frame
For the loads of Odesa: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.
How these numbers are computed
Nearby
- Mykolaivka6 km1,303 kWh/kWp
- Novomykolaivka6 km1,307 kWh/kWp
- Strumok9 km1,289 kWh/kWp
- Desantne10 km1,322 kWh/kWp
- Myrne10 km1,307 kWh/kWp
- Hlyboke10 km1,295 kWh/kWp
All places: Bilhorod-Dnistrovskyi RaionOdesa Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.