Solar plant: site data

Solar power plant in Nerushay, Bilhorod-Dnistrovskyi Raion, Odesa Oblast

Nerushay: 1,298 kWh per kWp a year, tilt 36° 1° east of south (PVGIS). 6.3% above the oblast median (1,221). #52 of 134 in the rayon, #85 of 1177 in the oblast.

Bilhorod-Dnistrovskyi, the rayon centre, is 88 km away. 12 m above sea level. 31 km away: Kiliya, the nearest bigger centre, 1,311 — 1.0% less here. Snow and wind from the nearest regional centre in the DBN — Одеса, 131 km. 8.79 m between rows, pitch 12.66 m (latitude 45.7°).

Yield of 1 kWp
1,298kWh/year
Tilt
36°1° east of south
10 kW
12,976kWh/year
Row pitch
12.66m · GCR 0.38
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
880 / 460Pa

Ground frame designer

A ground frame for a solar plant: Nerushay

The designer opens with this place’s coordinates, latitude 45.7° for the row spacing and the DBN loads of the nearest regional centre — Одеса, 131 km: snow 880 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

49Jan68Feb111Mar129Apr146May143Jun152Jul154Aug130Sep104Oct60Nov49Dec

August: 154 kWh/kWp, January: 49 — 3.1 times less.

December: 49 against 38 in the oblast, 28.9% more.

Nerushay: plants, kWh
kWpA yearAugustJanuary
56,488770245
1012,9761,540490
1519,4642,310735

Snow and wind: Одеса

Example: a 10 kW ground frame

For the loads of Odesa: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Bilhorod-Dnistrovskyi RaionOdesa Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.