Solar plant: site data

Solar power plant in Myrne, Izmailskyi Raion, Odesa Oblast

Myrne: 1,307 kWh per kWp a year, tilt 36° 1° east of south (PVGIS). 7.0% above the oblast median (1,221). #13 of 52 in the rayon, #53 of 1177 in the oblast.

Izmayil, the rayon centre, is 55 km away. 6 m above sea level. 21 km away: Kiliya, the nearest bigger centre, the same 1,311. Snow and wind from the nearest regional centre in the DBN — Одеса, 141 km. 8.75 m between rows, pitch 12.62 m (latitude 45.6°).

Yield of 1 kWp
1,307kWh/year
Tilt
36°1° east of south
10 kW
13,068kWh/year
Row pitch
12.62m · GCR 0.38
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
880 / 460Pa

Ground frame designer

A ground frame for a solar plant: Myrne

The designer opens with this place’s coordinates, latitude 45.6° for the row spacing and the DBN loads of the nearest regional centre — Одеса, 141 km: snow 880 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

51Jan68Feb113Mar130Apr146May144Jun153Jul155Aug130Sep104Oct61Nov50Dec

August: 155 kWh/kWp, December: 50 — 3.1 times less.

December: 50 against 38 in the oblast, 31.6% more.

Myrne: plants, kWh
kWpA yearAugustDecember
56,534775250
1013,0681,550500
1519,6022,325750

Snow and wind: Одеса

Example: a 10 kW ground frame

For the loads of Odesa: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Izmailskyi RaionOdesa Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.