Solar plant: site data

Solar power plant in Nove, Bilhorod-Dnistrovskyi Raion, Odesa Oblast

Nove: 1,293 kWh per kWp a year, tilt 36° 1° east of south (PVGIS). 5.9% above the oblast median (1,221). #58 of 134 in the rayon, #102 of 1177 in the oblast.

Bilhorod-Dnistrovskyi, the rayon centre, is 49 km away. 15 m above sea level. 49 km away: Bilhorod-Dnistrovskyi, the nearest bigger centre, the same 1,288. Snow and wind from the nearest regional centre in the DBN — Одеса, 92 km. 8.92 m between rows, pitch 12.79 m (latitude 45.9°).

Yield of 1 kWp
1,293kWh/year
Tilt
36°1° east of south
10 kW
12,929kWh/year
Row pitch
12.79m · GCR 0.37
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
880 / 460Pa

Ground frame designer

A ground frame for a solar plant: Nove

The designer opens with this place’s coordinates, latitude 45.9° for the row spacing and the DBN loads of the nearest regional centre — Одеса, 92 km: snow 880 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

48Jan66Feb112Mar131Apr147May143Jun153Jul153Aug130Sep103Oct60Nov46Dec

July: 153 kWh/kWp, December: 46 — 3.3 times less.

December: 46 against 38 in the oblast, 21.1% more.

Nove: plants, kWh
kWpA yearJulyDecember
56,465765230
1012,9291,530460
1519,3942,295690

Snow and wind: Одеса

Example: a 10 kW ground frame

For the loads of Odesa: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Bilhorod-Dnistrovskyi RaionOdesa Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.