Solar plant: site data
Solar power plant in Ternovi Pody, Mykolaivskyi Raion, Mykolaiv Oblast
Ternovi Pody: 1,246 kWh per kWp a year, tilt 36° 2° east of south (PVGIS). 4.0% above the oblast median (1,198). #94 of 238 in the rayon, #97 of 909 in the oblast.
Mykolayiv, the rayon centre, is 33 km away. 43 m above sea level. 26 km away: Bilozerka, the nearest bigger centre, 1,286 — 3.1% less here. Snow and wind from the nearest regional centre in the DBN — Херсон, 30 km. 9.47 m between rows, pitch 13.34 m (latitude 46.9°).
- Yield of 1 kWp
- 1,246kWh/year
- Tilt
- 36°2° east of south
- 10 kW
- 12,455kWh/year
- Row pitch
- 13.34m · GCR 0.36
- T_min
- -42 °Cregion II, south-eastern
- Snow S₀ / wind W₀
- 760 / 480Pa
Ground frame designer
A ground frame for a solar plant: Ternovi Pody
The designer opens with this place’s coordinates, latitude 46.9° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 30 km: snow 760 Pa, wind 480 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 153 kWh/kWp, December: 37 — 4.1 times less.
February: 61 against 54 in the oblast, 13.0% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 6,228 | 765 | 185 |
| 10 | 12,455 | 1,530 | 370 |
| 15 | 18,683 | 2,295 | 555 |
Example: a 10 kW ground frame
For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.
How these numbers are computed
Nearby
- Lyubomyrivka3 km1,246 kWh/kWp
- Zelenyi Hay4 km1,250 kWh/kWp
- Novohryhorivka5 km1,249 kWh/kWp
- Shmidtove6 km1,244 kWh/kWp
- Barvinok7 km1,250 kWh/kWp
- Myrne8 km1,253 kWh/kWp
All places: Mykolaivskyi RaionMykolaiv Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.