Solar plant: site data

Solar power plant in Ternovi Pody, Mykolaivskyi Raion, Mykolaiv Oblast

Ternovi Pody: 1,246 kWh per kWp a year, tilt 36° 2° east of south (PVGIS). 4.0% above the oblast median (1,198). #94 of 238 in the rayon, #97 of 909 in the oblast.

Mykolayiv, the rayon centre, is 33 km away. 43 m above sea level. 26 km away: Bilozerka, the nearest bigger centre, 1,286 — 3.1% less here. Snow and wind from the nearest regional centre in the DBN — Херсон, 30 km. 9.47 m between rows, pitch 13.34 m (latitude 46.9°).

Yield of 1 kWp
1,246kWh/year
Tilt
36°2° east of south
10 kW
12,455kWh/year
Row pitch
13.34m · GCR 0.36
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
760 / 480Pa

Ground frame designer

A ground frame for a solar plant: Ternovi Pody

The designer opens with this place’s coordinates, latitude 46.9° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 30 km: snow 760 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

42Jan61Feb107Mar129Apr142May143Jun153Jul152Aug129Sep99Oct54Nov37Dec

July: 153 kWh/kWp, December: 37 — 4.1 times less.

February: 61 against 54 in the oblast, 13.0% more.

Ternovi Pody: plants, kWh
kWpA yearJulyDecember
56,228765185
1012,4551,530370
1518,6832,295555

Snow and wind: Херсон

Example: a 10 kW ground frame

For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Mykolaivskyi RaionMykolaiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.