Solar plant: site data

Solar power plant in Zavadivka, Sambirskyi Raion, Lviv Oblast

Zavadivka: 1,016 kWh per kWp a year, tilt 37° 1° west of south (PVGIS). 6.3% below the oblast median (1,084). #254 of 264 in the rayon, #1495 of 1532 in the oblast.

Sambir, the rayon centre, is 43 km away. 555 m above sea level — above 500 m the DBN snow and wind are higher. 40 km away: Drohobych, the nearest bigger centre, 1,073 — 5.4% less here. Snow and wind from the nearest regional centre in the DBN — Ужгород, 81 km. 11.33 m between rows, pitch 15.15 m (latitude 49.1°).

Yield of 1 kWp
1,016kWh/year
Tilt
37°1° west of south
10 kW
10,159kWh/year
Row pitch
15.15m · GCR 0.32
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,340 / 370Pa

Ground frame designer

A ground frame for a solar plant: Zavadivka

The designer opens with this place’s coordinates, latitude 49.1° for the row spacing and the DBN loads of the nearest regional centre — Ужгород, 81 km: snow 1,340 Pa, wind 370 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

39Jan55Feb85Mar105Apr113May117Jun124Jul125Aug101Sep78Oct45Nov29Dec

August: 125 kWh/kWp, December: 29 — 4.3 times less.

December: 29 against 32 in the oblast, 9.4% less.

Zavadivka: plants, kWh
kWpA yearAugustDecember
55,080625145
1010,1591,250290
1515,2391,875435

Snow and wind: Ужгород

Example: a 10 kW ground frame

For the loads of Uzhhorod: 11.16 kWp, 18 panels, 366 kg of steel, 12 piles, materials ≈ 48,597 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Sambirskyi RaionLviv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.