Solar plant: site data
Solar power plant in Turka, Sambirskyi Raion, Lviv Oblast
Turka: 1,038 kWh per kWp a year, tilt 38° 3° east of south (PVGIS). 4.2% below the oblast median (1,084). #216 of 264 in the rayon, #1428 of 1532 in the oblast.
Sambir, the rayon centre, is 42 km away. 577 m above sea level — above 500 m the DBN snow and wind are higher. 41 km away: Drohobych, the nearest bigger centre, 1,073 — 3.3% less here. Snow and wind from the nearest regional centre in the DBN — Ужгород, 80 km. 11.60 m between rows, pitch 15.37 m (latitude 49.2°).
- Yield of 1 kWp
- 1,038kWh/year
- Tilt
- 38°3° east of south
- 10 kW
- 10,384kWh/year
- Row pitch
- 15.37m · GCR 0.31
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,340 / 370Pa
Ground frame designer
A ground frame for a solar plant: Turka
The designer opens with this place’s coordinates, latitude 49.2° for the row spacing and the DBN loads of the nearest regional centre — Ужгород, 80 km: snow 1,340 Pa, wind 370 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 125 kWh/kWp, December: 31 — 4.0 times less.
November: 48 against 44 in the oblast, 9.1% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,192 | 625 | 155 |
| 10 | 10,384 | 1,250 | 310 |
| 15 | 15,576 | 1,875 | 465 |
Example: a 10 kW ground frame
For the loads of Uzhhorod: 11.16 kWp, 18 panels, 366 kg of steel, 12 piles, materials ≈ 48,597 UAH.
How these numbers are computed
Nearby
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.