Solar plant: site data

Solar power plant in Losynets, Sambirskyi Raion, Lviv Oblast

Losynets: 1,007 kWh per kWp a year, tilt 36° 1° west of south (PVGIS). 7.1% below the oblast median (1,084). #257 of 264 in the rayon, #1505 of 1532 in the oblast.

Sambir, the rayon centre, is 43 km away. 614 m above sea level — above 500 m the DBN snow and wind are higher. 38 km away: Drohobych, the nearest bigger centre, 1,073 — 6.2% less here. Snow and wind from the nearest regional centre in the DBN — Ужгород, 82 km. 11.06 m between rows, pitch 14.93 m (latitude 49.1°).

Yield of 1 kWp
1,007kWh/year
Tilt
36°1° west of south
10 kW
10,065kWh/year
Row pitch
14.93m · GCR 0.32
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,340 / 370Pa

Ground frame designer

A ground frame for a solar plant: Losynets

The designer opens with this place’s coordinates, latitude 49.1° for the row spacing and the DBN loads of the nearest regional centre — Ужгород, 82 km: snow 1,340 Pa, wind 370 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

40Jan53Feb84Mar104Apr112May115Jun124Jul124Aug100Sep77Oct44Nov30Dec

July: 124 kWh/kWp, December: 30 — 4.1 times less.

March: 84 against 93 in the oblast, 9.7% less.

Losynets: plants, kWh
kWpA yearJulyDecember
55,033620150
1010,0651,240300
1515,0981,860450

Snow and wind: Ужгород

Example: a 10 kW ground frame

For the loads of Uzhhorod: 11.16 kWp, 18 panels, 366 kg of steel, 12 piles, materials ≈ 48,597 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Sambirskyi RaionLviv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.