Solar plant: site data

Solar power plant in Nyzhnie Husyne, Sambirskyi Raion, Lviv Oblast

Nyzhnie Husyne: 1,045 kWh per kWp a year, tilt 36° 1° west of south (PVGIS). 3.6% below the oblast median (1,084). #185 of 264 in the rayon, #1387 of 1532 in the oblast.

Sambir, the rayon centre, is 69 km away. 679 m above sea level — above 500 m the DBN snow and wind are higher. 46 km away: Perechyn, the nearest bigger centre, 1,100 — 5.0% less here. Snow and wind from the nearest regional centre in the DBN — Ужгород, 64 km. 10.87 m between rows, pitch 14.74 m (latitude 48.9°).

Yield of 1 kWp
1,045kWh/year
Tilt
36°1° west of south
10 kW
10,447kWh/year
Row pitch
14.74m · GCR 0.32
T_min
-38 °Cregion IIIA, Carpathian
Snow S₀ / wind W₀
1,340 / 370Pa

Ground frame designer

A ground frame for a solar plant: Nyzhnie Husyne

The designer opens with this place’s coordinates, latitude 48.9° for the row spacing and the DBN loads of the nearest regional centre — Ужгород, 64 km: snow 1,340 Pa, wind 370 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

41Jan58Feb91Mar108Apr116May121Jun128Jul128Aug103Sep79Oct43Nov28Dec

July: 128 kWh/kWp, December: 28 — 4.6 times less.

December: 28 against 32 in the oblast, 12.5% less.

Nyzhnie Husyne: plants, kWh
kWpA yearJulyDecember
55,224640140
1010,4471,280280
1515,6711,920420

Snow and wind: Ужгород

Example: a 10 kW ground frame

For the loads of Uzhhorod: 11.16 kWp, 18 panels, 366 kg of steel, 12 piles, materials ≈ 48,597 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Sambirskyi RaionLviv Oblast: rayons and towns

Free calculators

Sources