Solar plant: site data

Solar power plant in Verkhnie Husyne, Sambirskyi Raion, Lviv Oblast

Verkhnie Husyne: 1,049 kWh per kWp a year, tilt 36° 9° east of south (PVGIS). 3.2% below the oblast median (1,084). #172 of 264 in the rayon, #1368 of 1532 in the oblast.

Sambir, the rayon centre, is 71 km away. 711 m above sea level — above 500 m the DBN snow and wind are higher. 44 km away: Perechyn, the nearest bigger centre, 1,100 — 4.7% less here. Snow and wind from the nearest regional centre in the DBN — Ужгород, 61 km. 10.86 m between rows, pitch 14.73 m (latitude 48.9°).

Yield of 1 kWp
1,049kWh/year
Tilt
36°9° east of south
10 kW
10,487kWh/year
Row pitch
14.73m · GCR 0.32
T_min
-38 °Cregion IIIA, Carpathian
Snow S₀ / wind W₀
1,340 / 370Pa

Ground frame designer

A ground frame for a solar plant: Verkhnie Husyne

The designer opens with this place’s coordinates, latitude 48.9° for the row spacing and the DBN loads of the nearest regional centre — Ужгород, 61 km: snow 1,340 Pa, wind 370 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

40Jan58Feb92Mar109Apr117May123Jun129Jul129Aug103Sep78Oct44Nov27Dec

July: 129 kWh/kWp, December: 27 — 4.8 times less.

December: 27 against 32 in the oblast, 15.6% less.

Verkhnie Husyne: plants, kWh
kWpA yearJulyDecember
55,244645135
1010,4871,290270
1515,7311,935405

Snow and wind: Ужгород

Example: a 10 kW ground frame

For the loads of Uzhhorod: 11.16 kWp, 18 panels, 366 kg of steel, 12 piles, materials ≈ 48,597 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Sambirskyi RaionLviv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.