Solar plant: site data

Solar power plant in Komsomolets, Svativskyi Raion, Luhansk Oblast

Komsomolets: 1,139 kWh per kWp a year, tilt 37° 1° east of south (PVGIS). 0.9% below the oblast median (1,150). #43 of 189 in the rayon, #731 of 964 in the oblast.

Svatove, the rayon centre, is 22 km away. 175 m above sea level. 22 km away: Svatove, the nearest bigger centre, 1,131 — 0.7% more here. Snow and wind from the nearest regional centre in the DBN — Харків, 131 km. 11.62 m between rows, pitch 15.44 m (latitude 49.5°).

Yield of 1 kWp
1,139kWh/year
Tilt
37°1° east of south
10 kW
11,390kWh/year
Row pitch
15.44m · GCR 0.31
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,600 / 430Pa

Ground frame designer

A ground frame for a solar plant: Komsomolets

The designer opens with this place’s coordinates, latitude 49.5° for the row spacing and the DBN loads of the nearest regional centre — Харків, 131 km: snow 1,600 Pa, wind 430 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

38Jan56Feb90Mar116Apr137May143Jun146Jul146Aug120Sep84Oct40Nov23Dec

July: 146 kWh/kWp, December: 23 — 6.3 times less.

December: 23 against 26 in the oblast, 11.5% less.

Komsomolets: plants, kWh
kWpA yearJulyDecember
55,695730115
1011,3901,460230
1517,0852,190345

Snow and wind: Харків

Example: a 10 kW ground frame

For the loads of Kharkiv: 11.16 kWp, 18 panels, 385 kg of steel, 12 piles, materials ≈ 51,876 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Svativskyi RaionLuhansk Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.