Solar power plant in Stelmakhivka, Svativskyi Raion, Luhansk Oblast

Stelmakhivka: 1,138 kWh per kWp a year, tilt 37° 1° east of south (PVGIS). 1.0% below the oblast median (1,150). #53 of 189 in the rayon, #748 of 964 in the oblast.

Svatove, the rayon centre, is 20 km away. 163 m above sea level. 20 km away: Svatove, the nearest bigger centre, 1,131 — 0.6% more here. Snow and wind from the nearest regional centre in the DBN — Харків, 134 km. 11.61 m between rows, pitch 15.43 m (latitude 49.5°).

Yield of 1 kWp
1,138kWh/year
Tilt
37°1° east of south
10 kW
11,384kWh/year
Row pitch
15.43m · GCR 0.31
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,600 / 430Pa

Ground frame designer

A ground frame for a solar plant: Stelmakhivka

The designer opens with this place’s coordinates, latitude 49.5° for the row spacing and the DBN loads of the nearest regional centre — Харків, 134 km: snow 1,600 Pa, wind 430 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

39Jan56Feb88Mar115Apr137May143Jun147Jul147Aug120Sep83Oct40Nov23Dec

July: 147 kWh/kWp, December: 23 — 6.4 times less.

December: 23 against 26 in the oblast, 11.5% less.

Stelmakhivka: plants, kWh
kWpA yearJulyDecember
55,692735115
1011,3841,470230
1517,0762,205345

Snow and wind: Харків

Example: a 10 kW ground frame

For the loads of Kharkiv: 11.16 kWp, 18 panels, 359 kg of steel, 12 piles, materials ≈ 53,991 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed