Solar power plants: Luhansk Oblast
PVGIS data cover 964 of 964 places: 1 kWp yields from 1,120 kWh a year (Lysohorivka) to 1,170 (Cheremshyne), median 1,150 kWh/kWp at an optimal tilt of about 36°. That is 1.3% more than the median of Ukraine — 1,135 kWh/kWp.
- Median yield
- 1,150kWh/year
- From — to
- 1,120–1,170kWh/year
- Optimal tilt
- 36°median
- Places with PVGIS data
- 964of 964
Ground frame designer
A ground frame for a solar plant: Luhansk Oblast
The designer opens with latitude 48.6° and the DBN loads of the nearest regional centre — Харків: snow 1,600 Pa, wind 430 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Rayons
| Rayon | Places | Median, kWh/kWp | From — to |
|---|---|---|---|
| Alchevskyi Raion | 86 | 1,151 | 1,146–1,156 |
| Dovzhanskyi Raion | 108 | 1,159 | 1,148–1,170 |
| Luhanskyi Raion | 101 | 1,156 | 1,141–1,165 |
| Rovenkivskyi Raion | 96 | 1,155 | 1,149–1,167 |
| Svativskyi Raion | 189 | 1,135 | 1,120–1,154 |
| Siverskodonetskyi Raion | 100 | 1,151 | 1,131–1,157 |
| Starobilskyi Raion | 201 | 1,140 | 1,120–1,156 |
| Shchastynskyi Raion | 83 | 1,151 | 1,139–1,161 |
Towns and rayon centres
| Place | Rayon | kWh/kWp | Tilt |
|---|---|---|---|
| Alchevsk | Alchevskyi Raion | 1,149 | 36° |
| Dovzhansk | Dovzhanskyi Raion | 1,149 | 35° |
| Luhansk | Luhanskyi Raion | 1,159 | 37° |
| Novoaidar | Shchastynskyi Raion | 1,155 | 38° |
| Rovenky | Rovenkivskyi Raion | 1,157 | 35° |
| Siverskodonetsk | Siverskodonetskyi Raion | 1,150 | 37° |
| Starobilsk | Starobilskyi Raion | 1,140 | 36° |
| Svatove | Svativskyi Raion | 1,131 | 36° |
Snow and wind
The nearest regional centre in the DBN — Харків: S₀ = 1,600 Pa, W₀ = 430 Pa (DBN V.1.2-2:2006). Each place’s page names its own nearest centre and the distance. Snow and wind: Харків
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010