Solar power plant in Severynivka, Bilotserkivskyi Raion, Kyiv Oblast

Severynivka: 1,132 kWh per kWp a year, tilt 37° 3° east of south (PVGIS). 0.9% above the oblast median (1,122). #53 of 260 in the rayon, #224 of 1071 in the oblast.

Bila Tserkva, the rayon centre, is 28 km away. 190 m above sea level. 28 km away: Bila Tserkva, the nearest bigger centre, 1,122 — 0.9% more here. Snow and wind from the nearest regional centre in the DBN — Київ, 99 km. 11.70 m between rows, pitch 15.52 m (latitude 49.6°).

Yield of 1 kWp
1,132kWh/year
Tilt
37°3° east of south
10 kW
11,324kWh/year
Row pitch
15.52m · GCR 0.31
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,550 / 370Pa

Ground frame designer

A ground frame for a solar plant: Severynivka

The designer opens with this place’s coordinates, latitude 49.6° for the row spacing and the DBN loads of the nearest regional centre — Київ, 99 km: snow 1,550 Pa, wind 370 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

34Jan54Feb95Mar118Apr138May142Jun145Jul141Aug114Sep85Oct37Nov29Dec

July: 145 kWh/kWp, December: 29 — 5.0 times less.

December: 29 against 27 in the oblast, 7.4% more.

Severynivka: plants, kWh
kWpA yearJulyDecember
55,662725145
1011,3241,450290
1516,9862,175435

Snow and wind: Київ

Example: a 10 kW ground frame

For the loads of Kyiv: 11.16 kWp, 18 panels, 376 kg of steel, 12 piles, materials ≈ 47,122 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Bilotserkivskyi RaionKyiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.