Solar plant: site data

Solar power plant in Chernyn, Bilotserkivskyi Raion, Kyiv Oblast

Chernyn: 1,131 kWh per kWp a year, tilt 37° 3° east of south (PVGIS). 0.8% above the oblast median (1,122). #68 of 260 in the rayon, #264 of 1071 in the oblast.

Bila Tserkva, the rayon centre, is 31 km away. 170 m above sea level. 31 km away: Bila Tserkva, the nearest bigger centre, 1,122 — 0.7% more here. Snow and wind from the nearest regional centre in the DBN — Київ, 98 km. 11.70 m between rows, pitch 15.52 m (latitude 49.6°).

Yield of 1 kWp
1,131kWh/year
Tilt
37°3° east of south
10 kW
11,306kWh/year
Row pitch
15.52m · GCR 0.31
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,550 / 370Pa

Ground frame designer

A ground frame for a solar plant: Chernyn

The designer opens with this place’s coordinates, latitude 49.6° for the row spacing and the DBN loads of the nearest regional centre — Київ, 98 km: snow 1,550 Pa, wind 370 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

36Jan53Feb95Mar117Apr137May141Jun145Jul141Aug113Sep85Oct38Nov30Dec

July: 145 kWh/kWp, December: 30 — 4.8 times less.

December: 30 against 27 in the oblast, 11.1% more.

Chernyn: plants, kWh
kWpA yearJulyDecember
55,653725150
1011,3061,450300
1516,9592,175450

Snow and wind: Київ

Example: a 10 kW ground frame

For the loads of Kyiv: 11.16 kWp, 18 panels, 376 kg of steel, 12 piles, materials ≈ 47,122 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Bilotserkivskyi RaionKyiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.