Solar plant: site data

Solar power plant in Turgenevka, Bakhchysaraiskyi Raion, Autonomous Republic of Crimea

Turgenevka: 1,321 kWh per kWp a year, tilt 36° 1° east of south (PVGIS). 2.9% above the oblast median (1,284). #41 of 85 in the rayon, #189 of 1025 in the oblast.

Bakhchysaray, the rayon centre, is 7 km away. 187 m above sea level. 7 km away: Bakhchysaray, the nearest bigger centre, the same 1,320. Snow and wind from the nearest regional centre in the DBN — Херсон, 236 km. 8.31 m between rows, pitch 12.18 m (latitude 44.7°).

Yield of 1 kWp
1,321kWh/year
Tilt
36°1° east of south
10 kW
13,212kWh/year
Row pitch
12.18m · GCR 0.39
T_min
-20 °Cregion IV, Southern coast of Crimea
Snow S₀ / wind W₀
760 / 480Pa

Ground frame designer

A ground frame for a solar plant: Turgenevka

The designer opens with this place’s coordinates, latitude 44.7° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 236 km: snow 760 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

56Jan72Feb106Mar130Apr143May142Jun153Jul153Aug132Sep110Oct73Nov52Dec

July: 153 kWh/kWp, December: 52 — 2.9 times less.

January: 56 against 47 in the oblast, 19.1% more.

Turgenevka: plants, kWh
kWpA yearJulyDecember
56,606765260
1013,2121,530520
1519,8182,295780

Snow and wind: Херсон

Example: a 10 kW ground frame

For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Bakhchysaraiskyi RaionAutonomous Republic of Crimea: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.