Solar plant: site data
Solar power plant in Siren’, Bakhchysaraiskyi Raion, Autonomous Republic of Crimea
Siren’: 1,341 kWh per kWp a year, tilt 36° facing south (PVGIS). 4.4% above the oblast median (1,284). #17 of 85 in the rayon, #65 of 1025 in the oblast.
Bakhchysaray, the rayon centre, is 8 km away. 130 m above sea level. 8 km away: Bakhchysaray, the nearest bigger centre, 1,320 — 1.6% more here. Snow and wind from the nearest regional centre in the DBN — Херсон, 234 km. 8.31 m between rows, pitch 12.18 m (latitude 44.7°).
- Yield of 1 kWp
- 1,341kWh/year
- Tilt
- 36°facing south
- 10 kW
- 13,406kWh/year
- Row pitch
- 12.18m · GCR 0.39
- T_min
- -20 °Cregion IV, Southern coast of Crimea
- Snow S₀ / wind W₀
- 760 / 480Pa
Ground frame designer
A ground frame for a solar plant: Siren’
The designer opens with this place’s coordinates, latitude 44.7° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 234 km: snow 760 Pa, wind 480 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 156 kWh/kWp, December: 52 — 3.0 times less.
November: 74 against 63 in the oblast, 17.5% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 6,703 | 780 | 260 |
| 10 | 13,406 | 1,560 | 520 |
| 15 | 20,109 | 2,340 | 780 |
Example: a 10 kW ground frame
For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.
How these numbers are computed
Nearby
- Zheleznodorozhnoye2 km1,341 kWh/kWp
- Dachne3 km1,322 kWh/kWp
- Turgenevka3 km1,321 kWh/kWp
- Mostovoye3 km1,322 kWh/kWp
- Noven’koye4 km1,341 kWh/kWp
- Rechnoye4 km1,338 kWh/kWp
All places: Bakhchysaraiskyi RaionAutonomous Republic of Crimea: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.