Solar plant: site data

Solar power plant in Rechnoye, Bakhchysaraiskyi Raion, Autonomous Republic of Crimea

Rechnoye: 1,338 kWh per kWp a year, tilt 36° 1° east of south (PVGIS). 4.2% above the oblast median (1,284). #19 of 85 in the rayon, #71 of 1025 in the oblast.

Bakhchysaray, the rayon centre, is 6 km away. 112 m above sea level. 6 km away: Bakhchysaray, the nearest bigger centre, 1,320 — 1.4% more here. Snow and wind from the nearest regional centre in the DBN — Херсон, 230 km. 8.33 m between rows, pitch 12.20 m (latitude 44.7°).

Yield of 1 kWp
1,338kWh/year
Tilt
36°1° east of south
10 kW
13,384kWh/year
Row pitch
12.20m · GCR 0.39
T_min
-20 °Cregion IV, Southern coast of Crimea
Snow S₀ / wind W₀
760 / 480Pa

Ground frame designer

A ground frame for a solar plant: Rechnoye

The designer opens with this place’s coordinates, latitude 44.7° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 230 km: snow 760 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

55Jan72Feb109Mar132Apr146May145Jun157Jul155Aug134Sep110Oct74Nov50Dec

July: 157 kWh/kWp, December: 50 — 3.1 times less.

November: 74 against 63 in the oblast, 17.5% more.

Rechnoye: plants, kWh
kWpA yearJulyDecember
56,692785250
1013,3841,570500
1520,0762,355750

Snow and wind: Херсон

Example: a 10 kW ground frame

For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Bakhchysaraiskyi RaionAutonomous Republic of Crimea: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.