Solar plant: site data

Solar power plant in Tatysh-Konrat, Perekopskyi Raion, Autonomous Republic of Crimea

Tatysh-Konrat: 1,332 kWh per kWp a year, tilt 36° 4° west of south (PVGIS). 3.8% above the oblast median (1,284). #4 of 84 in the rayon, #107 of 1025 in the oblast.

Yany Kapu, the rayon centre, is 46 km away. 10 m above sea level. 17 km away: Rozdolne, the nearest bigger centre, 1,319 — 1.0% more here. Snow and wind from the nearest regional centre in the DBN — Херсон, 111 km. 8.84 m between rows, pitch 12.71 m (latitude 45.8°).

Yield of 1 kWp
1,332kWh/year
Tilt
36°4° west of south
10 kW
13,324kWh/year
Row pitch
12.71m · GCR 0.38
T_min
-27 °Cregion V, Crimean Mountains
Snow S₀ / wind W₀
760 / 480Pa

Ground frame designer

A ground frame for a solar plant: Tatysh-Konrat

The designer opens with this place’s coordinates, latitude 45.8° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 111 km: snow 760 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

49Jan66Feb113Mar136Apr152May149Jun163Jul160Aug135Sep103Oct62Nov43Dec

July: 163 kWh/kWp, December: 43 — 3.8 times less.

March: 113 against 106 in the oblast, 6.6% more.

Tatysh-Konrat: plants, kWh
kWpA yearJulyDecember
56,662815215
1013,3241,630430
1519,9862,445645

Snow and wind: Херсон

Example: a 10 kW ground frame

For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Perekopskyi RaionAutonomous Republic of Crimea: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.