Solar plant: site data

Solar power plant in Kukushkino, Perekopskyi Raion, Autonomous Republic of Crimea

Kukushkino: 1,310 kWh per kWp a year, tilt 36° 3° west of south (PVGIS). 2.1% above the oblast median (1,284). #33 of 84 in the rayon, #265 of 1025 in the oblast.

Yany Kapu, the rayon centre, is 41 km away. 44 m above sea level. 10 km away: Rozdolne, the nearest bigger centre, 1,319 — 0.6% less here. Snow and wind from the nearest regional centre in the DBN — Херсон, 119 km. 8.82 m between rows, pitch 12.69 m (latitude 45.7°).

Yield of 1 kWp
1,310kWh/year
Tilt
36°3° west of south
10 kW
13,104kWh/year
Row pitch
12.69m · GCR 0.38
T_min
-27 °Cregion V, Crimean Mountains
Snow S₀ / wind W₀
760 / 480Pa

Ground frame designer

A ground frame for a solar plant: Kukushkino

The designer opens with this place’s coordinates, latitude 45.7° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 119 km: snow 760 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

47Jan63Feb111Mar134Apr150May147Jun161Jul158Aug134Sep103Oct61Nov42Dec

July: 161 kWh/kWp, December: 42 — 3.8 times less.

December: 42 against 45 in the oblast, 6.7% less.

Kukushkino: plants, kWh
kWpA yearJulyDecember
56,552805210
1013,1041,610420
1519,6562,415630

Snow and wind: Херсон

Example: a 10 kW ground frame

For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Perekopskyi RaionAutonomous Republic of Crimea: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.