Solar plant: site data

Solar power plant in Orlovka, Perekopskyi Raion, Autonomous Republic of Crimea

Orlovka: 1,296 kWh per kWp a year, tilt 35° 2° west of south (PVGIS). 0.9% above the oblast median (1,284). #59 of 84 in the rayon, #388 of 1025 in the oblast.

Yany Kapu, the rayon centre, is 46 km away. 54 m above sea level. 14 km away: Rozdolne, the nearest bigger centre, 1,319 — 1.7% less here. Snow and wind from the nearest regional centre in the DBN — Херсон, 123 km. 8.58 m between rows, pitch 12.50 m (latitude 45.7°).

Yield of 1 kWp
1,296kWh/year
Tilt
35°2° west of south
10 kW
12,959kWh/year
Row pitch
12.50m · GCR 0.38
T_min
-27 °Cregion V, Crimean Mountains
Snow S₀ / wind W₀
760 / 480Pa

Ground frame designer

A ground frame for a solar plant: Orlovka

The designer opens with this place’s coordinates, latitude 45.7° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 123 km: snow 760 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

46Jan61Feb110Mar133Apr148May145Jun158Jul156Aug133Sep102Oct62Nov42Dec

July: 158 kWh/kWp, December: 42 — 3.8 times less.

December: 42 against 45 in the oblast, 6.7% less.

Orlovka: plants, kWh
kWpA yearJulyDecember
56,480790210
1012,9591,580420
1519,4392,370630

Snow and wind: Херсон

Example: a 10 kW ground frame

For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Perekopskyi RaionAutonomous Republic of Crimea: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.